BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2025 at 7:00 PM

Updated November 20, 2025

Site work for a playground / park / athletic field in Whitewater, Wisconsin. Completed plans call for site work for a playground / park / athletic field.

The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is advertising for bids from certified contractors for the Prucha Field Turf Replacement Miller Stadium University of Wisconsin - Whitewater Whitewater, Wisconsin. In general, the work consists of: The removal and replacement of the existing infield and foul ball areas synthetic turf for Prucha Field at Miller Stadium at the University of Wisconsin - Whitewater. The plans call for the removal and replacement of approximately 49,000 square feet of synthetic turf with an updated logo located near homeplate, necessary field markings, and necessary subgrade preparation, erosion control measures, and reestablishment of disturbed areas. All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $100,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from online. US Mail or Third-party delivery (UPS, Fedex, or DHL) to State of Wisconsin, Administration Building, 7 th Floor, 101 East Wilson Street, Madison, Wisconsin 53703 The bidder is responsible for the sealed bid being delivered to the indicated location or submitted via electronically before the time specified for the bid submission. Third party delivery is entirely at the bidder's risk. Contract offer and construction phase records will be processed electronically. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. Question Deadline 10/24/2025 Bidders shall bring inadequacies, omissions or conflicts to the Architect/Engineer's attention at least 8 ten (10) days before the date set for bid opening These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Bidding Documents will be available online immediately upon the project being advertised for bid.

Bid Results

Playgrounds / Parks / Athletic Fields

$268,960.00

Public - State/Provincial

Site Work

10

11

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
493
Active Projects
275
Bidding Soon
3,292
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

December 5, 2025

Project location map

1062 Schwager Dr, Whitewater, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.