Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 25, 2025 at 7:00 PM
Updated November 26, 2025
Site work and paving for a road / highway in Dallas, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Paving Improvements for Maplewood Meadows, Phase 2A Question Deadline 10/23/2025 All questions about the meaning or intent of the Bidding Documents are to be directed to ENGINEER Questions received less than three working days prior to the date for opening of Bids may not be answered. Project Description UES Report No. G250646 Maplewood Meadows, Phases 2A and 2B are located within the City of Talty, ETJ, Kaufman County, Texas. Maplewood Meadows, Phases 2A and 2B, contain 120 and 185 residential lots respectively. Maplewood Meadows, Phases 2A and 2B Earthwork Improvements consist of grading approximately 120 and 185 residential lots respectively and approximately 8,700 linear feet of local streets and 1,110 linear feet of collector streets. Maplewood Meadows, Phase 2A Utility Improvements consist of approximately 3,000 linear feet of residential sanitary sewer, 300 linear feet of regional sanitary sewer, 3,700 linear feet of residential waterline, and 1,100 linear feet of storm sewer. Maplewood Meadows, Phase 2A Paving Improvements consist of approximately 10,600 SY of 6" reinforced concrete paving, and 3,300 SY of 7" reinforced concrete and approximately 250 SY of concrete sidewalk. The Maplewood Meadows FM 2932 TxDOT improvements consist of approximately 170 SY of 7" reinforced concrete improvements and 1,300 SY of 2" asphalt improvements.
Bid Results
Roads / Highways
$1,289,534.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 28, 2025
March 15, 2026
Maplewood Ave, Dallas, TX
Related To This Project
Dallas, TX
Bid Date: Oct 08 2025
Dallas, TX
Bid Date: Dec 12 2025
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Oct 15 2025
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Oct 13 2025
Dallas, TX
Bid Date: Nov 10 2025
Dallas, TX
Bid Date: Jul 13 2021
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Oct 28 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
