Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 9, 2025 at 7:00 PM
Updated January 6, 2026
Renovation of a transportation facility in Dallas, Texas. Completed plans call for the renovation of a runway / taxiway.
https://www.bizjournals.com/dallas/news/2025/12/08/westside-village-tif-dallas-executive-new.html Summary (Based Only on Provided Article Content) Westside Village in Fort Worth is seeking TIF (tax increment financing) funds. A 100,000-square-foot office building is planned as part of the project. The project is described as a massive mixed-use development. The project involves the firm of billionaire Robert Bass. The preview also mentions new development at Dallas Executive Airport and Dallas Love Field Airport, as well as plans for Klyde Warren Park 2.0 in Dallas and a new mixed-use project in Plano, but no additional construction-specific details are provided for these. No project value, estimated start date, or confirmed scope details beyond the 100,000-square-foot office building are included in the text provided. ___________________________________________________________________________________________________________________________________ The City of Dallas Department of Aviation is seeking a qualified vendor to demolish and dispose/store at the City's discretion, twenty (20) existing Jet Bridge Mount heating, ventilation, and air conditioning units (HVAC) units and to install twenty (20) Pre-Conditioned Air (PCA) 30-Ton DX-3 Circuit - Jet Bridge Mount HVAC units at various passenger jet bridges at Dallas Love Field Airport. Questions Due Date: Oct 22nd 2025, 1:00 PM CDT 1. Identify the storage location of new PCAs and designate an area to store the existing units upon removal. 2. Provide removal and disposal of existing PCAs. 3. Stage all parts and equipment for new PCAs. 4. Disconnect power to the gate and PCAs. 5. Remove power, communication cables, and control stations. 6. Mechanically remove all mounting brackets. 7. Move the existing units away from the Passenger Jet Bridges. 8. Mechanically install the new units with new brackets provided by the manufacturer. 9. Install power, communication cables, and control stations. 10.Test units for correct operational functioning. 11.Once testing is completed for each unit, the unit will be turned back over to airport operations.
Post-Bid
Transportation Terminals
$200,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 7, 2025
March 2, 2026
8008 Herb Kelleher Way, Dallas, TX
Related To This Project
Dallas, TX
Bid Date: Oct 23 2025
Dallas, TX
--
Dallas, TX
Bid Date: Oct 28 2025
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Jul 13 2021
Dallas, TX
Bid Date: Nov 10 2025
Dallas, TX
Bid Date: Oct 13 2025
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
