BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2025 at 7:00 PM

Updated January 6, 2026

Renovation of a transportation facility in Dallas, Texas. Completed plans call for the renovation of a runway / taxiway.

https://www.bizjournals.com/dallas/news/2025/12/08/westside-village-tif-dallas-executive-new.html Summary (Based Only on Provided Article Content) Westside Village in Fort Worth is seeking TIF (tax increment financing) funds. A 100,000-square-foot office building is planned as part of the project. The project is described as a massive mixed-use development. The project involves the firm of billionaire Robert Bass. The preview also mentions new development at Dallas Executive Airport and Dallas Love Field Airport, as well as plans for Klyde Warren Park 2.0 in Dallas and a new mixed-use project in Plano, but no additional construction-specific details are provided for these. No project value, estimated start date, or confirmed scope details beyond the 100,000-square-foot office building are included in the text provided. ___________________________________________________________________________________________________________________________________ The City of Dallas Department of Aviation is seeking a qualified vendor to demolish and dispose/store at the City's discretion, twenty (20) existing Jet Bridge Mount heating, ventilation, and air conditioning units (HVAC) units and to install twenty (20) Pre-Conditioned Air (PCA) 30-Ton DX-3 Circuit - Jet Bridge Mount HVAC units at various passenger jet bridges at Dallas Love Field Airport. Questions Due Date: Oct 22nd 2025, 1:00 PM CDT 1. Identify the storage location of new PCAs and designate an area to store the existing units upon removal. 2. Provide removal and disposal of existing PCAs. 3. Stage all parts and equipment for new PCAs. 4. Disconnect power to the gate and PCAs. 5. Remove power, communication cables, and control stations. 6. Mechanically remove all mounting brackets. 7. Move the existing units away from the Passenger Jet Bridges. 8. Mechanically install the new units with new brackets provided by the manufacturer. 9. Install power, communication cables, and control stations. 10.Test units for correct operational functioning. 11.Once testing is completed for each unit, the unit will be turned back over to airport operations.

Post-Bid

Transportation Terminals

$200,000.00

Public - City

Renovation

15

8

9

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
389
Active Projects
200
Bidding Soon
3,738
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.