BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 10, 2026

Site work, paving, outdoor lighting and new construction of a mixed-use development in Great Falls, Montana. Conceptual plans call for the construction of a 181,000-square-foot military facility; for site work for a military facility; water / sewer project; for outdoor lighting for a military facility; and for paving for a military facility.

Construct a Consolidated Maintenance Facility (CMF) of approximately 181,000 square feet to support the Missile Maintenance Squadron and Sentinel mission requirements at Malmstrom Air Force Base. The facility will include administrative offices, maintenance shops, and drive-thru high bays equipped with overhead cranes and vehicle exhaust systems to accommodate Transporter Erectors (TE), Payload Transporters (PT), and Missile Transporters (MT). Additional features include a vault, secure storage areas, a loading dock, and shipping/receiving areas with forklift maneuvering space. Construction will involve a deep reinforced concrete foundation (pier and grade beam), structural slab, structural steel framing, insulated metal panel exterior walls, interior masonry or metal stud partitions, and a sloped standing seam metal roof. Building systems will include electrical, mechanical, water, sewer, fire and lightning protection, security, NIPR and SIPR communications, and emergency power via a diesel generator with fuel storage and secondary containment. Site development will include clearing, grading, drainage, utilities, communications connections, access paving, parking, walkways, and landscaping. The scope also includes selective demolition of existing facilities to support site development and utility tie-ins. The anticipated period of performance is approximately 1,523 calendar days, with a construction award targeted for fiscal year 2027. Location: Malmstrom Air Force Base, 21 77th St N, Malmstrom AFB, MT 59402 In accordance with DFARS 236.204, construction magnitude is estimated to be in the price range of between $250,000,000 and $500,000,000. As of June 9, 2026, a contractor selection timeline has not been disclosed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Military

$500,000,000.00

Public - Federal

New Construction, Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
11
Bidding Soon
144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2026

Project location map

To Be Determined, Great Falls, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.