BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Demolition and site work for a residential development in Williamstown, West Virginia. Completed plans call for the demolition of a residential development; and for site work for a residential development.

The County Commission of Wood County is accepting sealed bids for the demolition and removal of structures, all trash, and debris within the property located at 44 Sandalwood Drive, Williamstown, WV 26187. The County Commission reserves the right to reject any and/or all bids. Structures needing demolished are located at 44 Sandalwood Drive, Williamstown WV 26187 -A dilapidated multi-story residential structure on block concrete foundation with a lower basement with a large tree that fell over entire house, as well as a dilapidated garage/building on the parcel beside the residential structure. Property is owned by Mary Dowler who resides at 58 Sandalwood Drive Williamstown WV 26187. The property contains 1 dilapidated multi-story residential structure and a very dilapidated garage structure which are both to be demolished and removed. There is also 1 small metal storage building which is located between the dilapidated home and dilapidated garage and is to be left alone as owner will still use for storage. The main work of the project is to demolish and remove in its entirety the multi-story home as well as the dilapidated garage structure. The garage is sitting on a concrete slab that goes out into the driveway and owner wishes to keep the concrete slab as they have future potential use for the slab. All demolished materials, debris, refuse, junk, and trash will need to be removed. Successful bidder will be responsible for the disconnection of all utilities prior to demolition, along with conducting proper asbestos inspection, testing, and abatement. There will be a demolition permit required and a cleared asbestos report BEFORE any demolition begins. Materials removed from the site are to be disposed of in a licensed asbestos landfill. Further, any disturbed land will be graded, seeded, and covered with straw upon completion. ***Demolition of the structure will be completed within 30 days from the date the contractor is notified of the Awarded bid.

Award

Residential Subdivision

$7,200.00

Public - County

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
2
Bidding Soon
636
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

November 24, 2025

Project location map

44 Sandalwood Dr, Williamstown, WV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.