BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2025 at 8:00 PM

Updated October 24, 2025

This is a service / maintenance or supply contract in Omaha, Nebraska. Contact the soliciting agency for additional information.

Furnishing all labor, tools, materials, and equipment required to construct WASTE COLLECTION 2025 for Sanitary and Improvement District No . 575, DOUGLAS County, Nebraska, as per the plans and specifications for said work, and at the locations shown on the detailed drawings and in the specifications available for online or at the office of Lamp Rynearson The work consists essentially of the following estimated quantities: ITEM NO. DESCRIPTION APPROXIMATE QUANTITIES APPROXIMATE QUANTITY UNIT PRICE PER LOCATION PER MONTH AMOUNT BASE BID (1 WASTE CART, 1 RECYCLING CART, EVERY-OTHER-WEEK RECYCLING) JANUARY 1, 2026 THROUGH DECEMBER 31, 2026 1. 2.WASTE COLLECTION - TRASH AND YARD WASTE (1 CART) WASTE COLLECTION - RECYCLING ( EVERY-OTHER-WEEK) 278 EA 278 EA 2026 MONTHLY SUBTOTAL ESTIMATED CONTRACT COST 2026 SUBTOTAL ESTIMATED CONTRACT COST - (JANUARY 1, 2026 THROUGH DECEMBER 31, 2026) (multiply monthly subtotal by 12 months) JANUARY 1, 2027 THROUGH DECEMBER 31, 2027 3. 4. WASTE COLLECTION - TRASH AND YARD WASTE (1 CART) WASTE COLLECTION - RECYCLING ( EVERY-OTHER-WEEK) 306 EA 306 EA 2027 MONTHLY SUBTOTAL ESTIMATED CONTRACT COST 2027 SUBTOTAL ESTIMATED CONTRACT COST - (JANUARY 1, 2027 THROUGH DECEMBER 31, 2027) (multiply monthly subtotal by 12 months) JANUARY 1, 2028 THROUGH DECEMBER 31, 2028 5. 6. WASTE COLLECTION - TRASH AND YARD WASTE (1 CART) WASTE COLLECTION - RECYCLING ( EVERY-OTHER-WEEK) 334 EA 334 EA 2028 MONTHLY SUBTOTAL ESTIMATED CONTRACT COST 2028 SUBTOTAL ESTIMATED CONTRACT COST - (JANUARY 1, 2028 THROUGH DECEMBER 31, 2028) (multiply monthly subtotal by 12 months) TOTAL ESTIMATED CONTRACT COST - JANUARY 1, 2026 THROUGH DECEMBER 31, 2028 (BASE BID ITEMS 1-6) ESTIMATED ENGINEERING, LEGAL, PUBLICATION AND MISCELLANEOUS COSTS TOTAL ESTIMATED PROJECT COST - BASE $23.00 $1.00 $24.00 $1.00 $7,650.00 $25.00 $1.00 ALTERNATE BID (2 WASTE CARTS, 1 RECYCLING CART, EVERY-OTHER-WEEK RECYCLING) JANUARY 1, 2026 THROUGH DECEMBER 31, 2026 7. 8. WASTE COLLECTION - TRASH AND YARD WASTE (2 CARTS) WASTE COLLECTION - RECYCLING ( EVERY-OTHER-WEEK) 278 EA 278 EA 2026 MONTHLY SUBTOTAL ESTIMATED CONTRACT COST 2026 SUBTOTAL ESTIMATED CONTRACT COST - (JANUARY 1, 2026 THROUGH DECEMBER 31, 2026) (multiply monthly subtotal by 12 months) JANUARY 1, 2027 THROUGH DECEMBER 31, 2027 9. 10. WASTE COLLECTION - TRASH AND YARD WASTE (2 CARTS) WASTE COLLECTION - RECYCLING ( EVERY-OTHER-WEEK) 306 EA 306 EA 2026 MONTHLY SUBTOTAL ESTIMATED CONTRACT COST 2026 SUBTOTAL ESTIMATED CONTRACT COST - (JANUARY 1, 2026 THROUGH DECEMBER 31, 2026) (multiply monthly subtotal by 12 months) JANUARY 1, 2028 THROUGH DECEMBER 31, 2028 11. 12. WASTE COLLECTION - TRASH AND YARD WASTE (2 CARTS) WASTE COLLECTION - RECYCLING ( EVERY-OTHER-WEEK) 334 EA 334 EA 2028 MONTHLY SUBTOTAL ESTIMATED CONTRACT COST 2028 SUBTOTAL ESTIMATED CONTRACT COST - $24.00 $1.00 $25.00 $1.00 $26.00 $1.00 $6,394.00 $278.00 $6,672.00 $80,064.00 $7,344.00 $306.00 $91,800.00 $8,350.00 $334.00 $8,684.00 $104,208.00 $276,072.00 $33,128.00 $309,200.00 $6,672.00 $278.00 $6,950.00 $83,400.00 $7,650.00 $306.00 $7,956.00 $95,472.00 $8,684.00 $334.00 $9,018.00 (JANUARY 1, 2028 THROUGH DECEMBER 31, 2028) (multiply monthly subtotal by 12 months) TOTAL ESTIMATED CONTRACT COST - JANUARY 1, 2026 THROUGH DECEMBER 31, 2028 (ALTERNATE BID ITEMS 7-12) ESTIMATED ENGINEERING, LEGAL, PUBLICATION AND MISCELLANEOUS COSTS TOTAL ESTIMATED PROJECT COST - ALTERNATE $108,216.00 $287,088.00 $34,412.00 $321,500.00 The amount of the engineer's estimate of cost of said improvements (exclusive of engineering, fiscal, legal, interest, and miscellaneous costs) is $309,200.00 to $321,500.00. All proposals must be submitted on bid forms furnished by Lamp Rynearson and must be accompanied by a bid bond or a certified check in the amount not less than $15,767.50 (FIFTEEN THOUSAND, SEVEN HUNDRED SIXTY-SEVEN AND 50/100 DOLLARS), payable without condition to the Treasurer of Sanitary and Improvement District No. 575, as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of THIRTY (30) days after date set for opening of bids. All proposals must be enclosed in an envelope, sealed and addressed to the Clerk of Sanitary and Improvement District No . 575 and shall be marked "PROPOSAL FOR WASTE COLLECTION 2025" with the bidder's name and address on said envelope. The Bid Security shall be in a separate sealed envelope attached to the proposal envelope and shall be marked "BID SECURITY" with the project identified thereon. Proposals received after the above time shall be returned unopened to the bidder submitting the proposal. The work herein provided shall be done under written contract with the responsible bidder submitting the lowest acceptable bid in accordance with the requirements of the plans and specifications and as provided by law. Sanitary Improvement District 575 of DOUGLAS County, Nebraska reserves the right to reject any or all bids received and to waive informalities and irregularities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$321,500.00

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
96
Bidding Soon
948
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2025

January 1, 2026

Project location map

Multiple Locations, Omaha, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.