Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 19, 2025 at 7:00 PM
Updated December 20, 2025
Renovation of a municipal facility in Chicago, Illinois. Working plans call for the renovation of a one-story above grade municipal facility.
**As of December 19, 2025, the project is cancelled. No definite date for the rebid.** The contractor shall provide all necessary labor, materials, equipment, supplies, and any incidentals required to replace and upgrade the fire alarm systems at the designated facilities. This includes the removal and proper disposal of the existing fire alarm panels and components, in compliance with environmental standards, regulatory guidelines, and the Chicago Fire Prevention Code. The contractor will be responsible for delivering, installing, and fully integrating new fire alarm panels that meet or exceed NFPA standards, the Chicago Building Code, and other applicable fire safety regulations. All work must adhere to compliance requirements, including securing the necessary permits and scheduling required inspections through the City of Chicago's permitting process. The contractor must implement comprehensive safety protocols to safeguard personnel, facility infrastructure, and utilities throughout the project's duration. The contractor is required to conduct detailed testing and commissioning of the newly installed fire alarm panels to confirm their functionality and compatibility with the existing systems, including proper integration with detection devices, pull stations, and auxiliary components. Operational readiness must be verified to comply with fire safety standards, including the Chicago Fire Prevention Code. Detailed documentation, including test results, certifications, and regulatory approvals, must be provided prior to project closeout. The contractor must coordinate all activities with the designated project manager to align with the facility's operational hours, Monday through Friday, 7:30 am to 5:00 pm. Question Deadline 10/22/2025
Final Planning
Municipal
$400,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2025
June 19, 2026
Multiple Locations, Chicago, IL
Related To This Project
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Nov 07 2025
Chicago, IL
Bid Date: Nov 07 2025
Chicago, IL
Bid Date: Nov 07 2025
Chicago, IL
Bid Date: Nov 07 2025
Chicago, IL
--
Chicago, IL
Bid Date: Nov 05 2025
Chicago, IL
Bid Date: Oct 22 2025
Chicago, IL
Bid Date: Jan 16 2026
Chicago, IL
Bid Date: Jan 16 2026
Chicago, IL
Bid Date: Nov 07 2025
Chicago, IL
--
Chicago, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
