BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2026 at 7:00 PM

Updated February 28, 2026

Site work, paving, outdoor lighting and new construction of a mixed-use development in Chicago, Illinois. Design plans call for site work for a municipal facility; for the construction of a 300-unit, 60-space multi-residential development; office development; and retail development.

As of February 27, 2026, a design team and contractors have been selected and developer identified. It is a 25-story mixed-use building as the winning proposal to redevelop city property at 331-35 S. Plymouth Court in the Loop. Located near CTA Brown, Orange, Pink, Purple and Red Line stations. The project includes 300 mixed-income residences, ground-floor retail and restaurant space, co-working space and live/work lofts. Twenty percent of the units would be affordable, and the building would be served by 60 parking spaces. The proposal will require City Council approval and must secure several small grants ahead of groundbreaking. Project will now be known as ACoDA. The City of Chicago is seeking applications from development teams to redevelop a cluster of four City owned parcels at 331-335 S. Plymouth Ct. in the Loop. The Loop is Chicago's fastest growing community area and part of the fastest growing downtown in the United States. Consisting of approximately 15,352 square feet, the site presents a unique opportunity to create an equitable, transit-oriented neighborhood adjacent to regional assets and attractions including Pritzker Park, Harold Washington Library, and several higher education institutions including the University of Illinois at Chicago School of Law, DePaul University, Columbia College, School of the Art Institute, and Roosevelt University. The site is also near Millennium Park, Grant Park, and the Art Institute. The site is served by the Chicago Transit Authority's (CTA) Red, Blue, Orange, Brown, Pink, and Purple train lines and multiple bus routes. Questions about the application process may be submitted via email between Aug. 1 and Sept. 30, 2025, to Emily.Thrun@cityofchicago.org. Questions will be compiled and published at regular intervals in FAQ format until Oct. 15, 2025. The method of Contractor Selection has not been Determined at this time

Design

Multi-Residential

$162,200,000.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
9
Bidding Soon
2,703
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 1, 2027

Project location map

331 S Plymouth Ct, Chicago, IL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.