BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 21, 2025 at 7:00 PM

Updated November 22, 2025

Site work and paving for a sidewalk / parking lot in Ozark, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of November 21st, 2025, this project has not yet been awarded. The project is expected to be on December 15th, 2025** Any questions regarding this project must be submitted to Matt DeMoss at mdemoss@cmtengr.com by 4:00 pm local time on October 30, 2025. The Scope of Work includes construction of a 10 foot wide ADA-compliant concrete trail and ramps, earthwork, pedestrian bridge, railing, creek grading, traffic control, erosion control and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. The City of Ozark anticipates issuing notice to proceed in January 2026. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. For a contractor to be awarded this project the contractor must have a fully responsive contractor questionnaire on file with the Missouri Highway and Transportation Commission at least 7 days prior to the bid opening date. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, October 1, 2025 edition. No Second Tier Subcontracting will be allowed. The DBE Contract Goal for this project is 0%. DBE firms must be certified by MoDOT to attain credit towards this contract goal. There is no On the Job Trainee goal. Any questions regarding this project must be submitted to the following contact: Matt DeMoss at mdemoss@cmtengr.com by 4:00 pm local time on October 30,2025.No written questions after this date or any verbal questions will be recognized. The Owner Intends to Award the Contract to the Lowest, Responsive, Responsible Bidder of All Three Contracts. the Owner Reserves the Right to Reject Any and All Bids, and to Waive Any Irregularities in the Best Interest of the Owner With Modots Consent. MODOT - Finley River Trail Extension

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

23

11

11

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
56
Bidding Soon
578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

January 1, 2026

Project location map

891-961 N Riverside Rd, Ozark, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.