BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Renovation of a water / sewer project in Ipswich, Massachusetts. Completed plans call for the renovation of a water / sewer project.

The work consists of the replacement and relocation of the Motor Control Centers (MCC) and associated ancillary devices from the existing electrical room to the former Chlorine Scale Room, which will be fit-out as the new electrical room. The work also includes demolition and removal of obsolete equipment in the existing electrical room - including MCC-1, MCC-2, DP1, Transformer, P1A, P1B, SPD and installation of new distribution equipment, as well as reconnection of existing equipment to the new electrical system. Additionally, the scope includes replacement of the existing generator, and interior and exterior lighting improvements. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The work consists of the replacement and relocation of the Motor Control Centers (MCC) and associated ancillary devices from the existing electrical room to the former Chlorine Scale Room, which will be fit-out as the new electrical room. The work also includes demolition and removal of obsolete equipment in the existing electrical room including MCC-1, MCC-2, DP1, Transformer, P1A, P1B, SPD and installation of new distribution equipment, as well as reconnection of existing equipment to the new electrical system. Additionally, the scope includes replacement of the existing generator, and interior and exterior lighting improvements. Bids shall be on a lump sum basis as indicated in the Bid Form. Question Deadline 10/31/2025 All questions about the meaning or intent of the Bidding Documents shall be submitted in writing to the Engineer via the Tighe & Bond website Prospective Bidders must be registered users of the website to submit questions regarding the project. In order to receive consideration, questions must be received by Engineer at least five days prior to the date fixed for the opening of Bids

Award

Water / Sewer

$1,540,000.00

Public - City

Renovation

32

13

35

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
478
Active Projects
178
Bidding Soon
3,691
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2025

January 6, 2026

Project location map

20 Fowlers Ln, Ipswich, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.