BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Site work, new construction and renovation of a mixed-use development in Robertsdale, Alabama. Completed plans call for the construction of a 79,000-square-foot, one-story above grade educational facility; for site work for a educational facility; and for the renovation of a 11,000-square-foot educational facility.

**As of October 9,2025,the pre-qualification is due by October 28th at 4:00 PM, and a non-refundable $600 deposit is required for the drawings. FOR: New Elementary School, Baldwin County Early Learning Academy-Phase 2 Building Package Only general contractors who have been approved to bid pursuant to prequalification procedures and criteria established by the Owner will be eligible to bid for the Project.The Owner shall qualify General Contractors who have successfully completed similar projects on time for satisfied Owners. Pre-Qualification Applications shall be received at the office of the Baldwin County Board of Education, C/O Marlana Hanner, 23651 Flowers Rd. Robertsdale, AL 36567 until 4:00 pm on October 28, 2025. Written prequalification procedures and criteria are available for review at the office of the Architect. Sealed proposals will then be received for Baldwin County Early Learning Academy- Phase 2 Building Package project for the Baldwin County Board of Education by Marlana Hanner, at 23651 Flowers Road Robertsdale, AL 36567 until 2:00 PM CST on (The BID DATE for this project will be provided to qualifying contractors.) A bid bond payable to the Baldwin County Board of Education in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and payment bonds and evidence of insurance and E-Verify documentation will be required at the signing of the contract. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. Baldwin County Early Learning Academy- Phase 2 Building Construction Construction of a new Pre-K Elementary school in Silverhill. The work includes new construction services required for a single story, +/- 79,000 sq. ft building with ancillary spaces and the renovation of the existing +/- 11,000 sq. ft. gym. This includes but is not limited to: site work, CMU block walls, structural steel framing, brick veneer, windows, membrane roof, plumbing, mechanical and electrical services.

GC Bidding

Educational

$31,500,000.00

Public - County

New Construction, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
34
Bidding Soon
730
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2026

March 23, 2026

Project location map

Multiple Locations, Robertsdale, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.