BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work for a civil project in Plummer, Idaho. Completed plans call for site work for a water / sewer project.

**As of November 14th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Pressure-Dosed Mound Septic System project consisting of the construction of a pressure-dosed mound septic system for waste water and associated site improvements in Worley, Idaho. Description of the Work: Pressure-Dosed Mound Septic System: Contractor to install a Pressure-Dosed Mound Septic System, including septic tank with dosing chamber and pump, pressure pipe to mound drain field, construct mound drain field, construct sewer service line with cleanout and electrical service from home to septic tank, meeting the requirements of the construction documents. The right is reserved to reject all proposals, or to accept the bid proposal deemed best for the Coeur d' Alene Tribe. This guarantee must be in the form of a certified check, bid bond, or cashier's check in the amount of ten percent (5%) of the total bid. For information regarding contracting information, contact the Tribal Coordinator for this project: Tyrone Daniels Facilities Director 44391 S Highway 95 Worley, ID 83876 208-987-0556 Tyrone.daniels@cdatribe-nsn.gov SUMMARY A. The work to be performed under this contract shall consist of furnishing the following to perform the work outlined in these specifications and as indicated by Project Drawings: 1. Tools 2. Equipment 3. Materials 4. Labor 5. Supplies 6. Manufactured articles 7. All transportation to complete the work 8. Temporary facilities B. Location of Work: Coeur d'Alene Reservation, Worley, Kootenai County, Idaho C. Incidentals Items: All work, materials, and services not expressly listed as being provided by others or not expressly called for in the contract but necessary for the completion of the work in good faith, shall be furnished, installed, and performed by WORK REQUIRED A. Furnish all labor, materials, equipment, and supervision necessary to construct the following facilities as described by these specifications and drawings. All work, materials, and services not expressly listed as being provided by others or that are called for in the contract or necessary to provide a complete and operational system shall be furnished, installed, and performed by the Contractor. 1. Schedule A - Install Pressure-Dosed Mound Septic System a. Install septic tank with dosing chamber and pump b. Install pressure pipe to mound drain field c. Construct mound drainfield d. Construct sewer service line with cleanout and electrical service from home to septic tank.

Post-Bid

Water / Sewer

$600,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
19
Bidding Soon
336
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

December 5, 2025

Project location map

To Be Determined, Plummer, ID

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.