BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 4, 2025 at 7:00 PM

Updated November 5, 2025

Site work for a bridge / tunnel in Aaron, Kentucky. Conceptual plans call for site work for a bridge / tunnel.

SD1 is requesting qualifications from engineering firms interested in providing Professional Engineering Design services for the Licking River Tunnel Solution (LRTS). The Consultant will be responsible for conducting a comprehensive evaluation of design alternatives. The method of Contractor Selection has not been Determined at this time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Bridges / Tunnels

$150,000,000.00

Public - State/Provincial

Site Work

34

11

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
112
Bidding Soon
773
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2026

Project location map

To be determined, Aaron, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.