BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated October 31, 2025

Renovation of a library in Fayetteville, North Carolina. Completed plans call for the renovation of a library.

Scope of work includes: Contractor shall demo/remove existing HVAC split system to include line sets. Contractor shall install new hangers for air handlers as needed. Contractor shall install new condensing unit and new air handler The new split system shall be (1) 15-ton, 3 phase split unit with heat strips. All new line set shall be installed which consist of up to 150 ft. Existing duct work shall be reconnected with proper connections. Inspections shall be included in proposal. The new equipment shall be operated and tested after install to ensure proper CFM ratings and ensure freon pressures are in adequate operating ranges. Contractor shall provide any additional material and subcontracting work needed to complete the project. Contractor shall be liable for any damage caused during demo and install. Contractor shall verify all work during pre-bid to ensure no change orders arise. Contractor shall cleanup work area and work areas shall be free of any debris during & after construction. Contractor shall coordinate schedule with Owners (Cumberland County). Contractor shall communicate with owners on schedule, timelines, and provide oversite over project. Contractor shall schedule start up with owners. A 5% bid bond is not required for this project. Performance and Payment Bonds are not required for this project. All Contractors are notified that North Carolina Statutory provisions as to licensing for Contractors will be observed in receiving, reading, and awarding of contracts. The County reserves the right to reject any or all bids. The bidder to whom the contract may be awarded must comply with the requirements of G.S. Section 143-131, as amended. No bids may be withdrawn after the scheduled closing time for the receipt of bids for a period of sixty (60) days. Project must be complete and turned over to Cumberland County prior to December 30, 2025.

Post-Bid

Library

$500,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
156
Bidding Soon
1,816
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2025

November 24, 2025

Project location map

3711 Village Dr, Fayetteville, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.