Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 28, 2025 at 8:00 PM
Updated October 29, 2025
Site work and paving for a mixed-use development in Belton, Missouri. Completed plans call for site work for a municipal facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and municipal facility.
The City of Belton Belton Public Works Department is seeking informal bids for the construction of a garbage dumpster corral located behind the City Hall Annex and a concrete pad for a picnic table. Work Description: Construct a reinforced concrete pad for the proposed corral with block walls on three sides, bollards on the inside to protect the structure, and fencing in front to allow easy access for City Staff and garbage contractor. Block used on the walls of the corral shall be split face and be approved by the Engineer prior to installation. Concrete pad for the corral shall be 10 feet in width, 21 feet in length, and 8 inches thick. Construction of an eight (8) inch thick concrete approach shall be placed in front of the concrete pad to connect the alleyway and the concrete pad. All concrete shall be KCMMB 4K mix. Finished surface of the concrete pad shall be sloped to the ditch line running along the north side of the alleyway through a pipe in the block wall at the adjoining corner. Construction of the concrete pad shall be in conformance with the City of Belton Standard Details for a commercial approach. Block walls shall be a minimum of six (6) feet high with #4 bar placed according to the plan attached. The bars shall also tie into the concrete pad. Four (4) bollards shall be spaced evenly along the inside of the back wall, and two (2) bollards shall be installed at even spacing to protect each side wall. Concrete bollards shall be spaced eight (8) inches from the adjacent wall measured from the centerline of the bollard. Concrete bollards shall be eight (8) inches in diameter and four (4) feet tall. Gate shall be a minimum of 18 feet wide (9 ft double swing), and constructed with either wood or metal and approved by the engineer. Gate shall swing more than 90 degrees and have an overhead clearance of 20 feet. Two (2) pin lock holes shall be drilled into the concrete to allow for locking of the gate. Ensure the dumpster corral is functional and compliant with local regulations. Picnic pad shall be constructed next to City Hall Annex as shown in the attached document. Picnic pad shall be KCMMB 4K mix and 10 feet in length and width. Construction of the concrete picnic pad shall be in conformance with the City of Belton Standard Details for sidewalk. Removal and replacement of approximately 25 feet of five (5) foot sidewalk to change the alignment around the corral. Construction of the removal and replacement of sidewalk shall be in conformance with the City of Belton Standard Details for sidewalk. All disturbed areas shall be restored with topsoil and seed. All disturbed pavement shall be removed and replaced to the satisfaction of the Engineer. Access for City officials and the public shall be maintained during construction. Payment, performance, and maintenance bonds shall be procured and business license(s) and construction permits obtained as required for the work. Please see attached documents for additional guidance. All requestions can forwarded to Kaleb Young by phone at 816-489-0222 or by email at kyoung@belton.org.
Bid Results
Municipal
$54,800.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 16, 2025
November 17, 2025
520 Main St, Belton, MO
Related To This Project
Belton, MO
Bid Date: Nov 13 2025
Belton, MO
Bid Date: Dec 03 2025
Belton, MO
Bid Date: Dec 04 2025
Belton, MO
Bid Date: Dec 19 2025
Belton, MO
Bid Date: Dec 05 2025
Belton, MO
Bid Date: Dec 03 2025
Belton, MO
Bid Date: Dec 18 2025
Belton, MO
Bid Date: Jan 30 2026
Belton, MO
Bid Date: Oct 14 2025
Belton, MO
Bid Date: Oct 28 2025
Belton, MO
Bid Date: Mar 09 2021
Belton, MO
Bid Date: Oct 09 2025
Belton, MO
Bid Date: Sep 26 2025
Belton, MO
Bid Date: Aug 29 2025
Belton, MO
Bid Date: Aug 22 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
