Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 13, 2025 at 8:00 PM
Updated October 14, 2025
Site work and paving for a civil project in Westford, Vermont. Conceptual plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.
The Town of Westford, Vermont is accepting proposals for culvert replacement and repaving costs associated with the development of a plan and bid package for the Milton-Westford Road (TH#2) Project. The project is a part of a Town Highway Class 2 Roadway Grant application. The project will begin at the junction of Milton-Westford Rd. and Vermont Route 128. The project must comply with all State and Local regulations. The length of road is 1.88 miles and runs from the intersection of Milton-Westford Rd and VT Route 128 and terminates at the Town of Milton line Proposals shall include the following information: Scope of Services: The work shall provide construction plans that will become part of a grant application/agreement. The construction plan shall include: Replacement of existing culvert #2160 with 55 feet of 24-inch gray plastic culvert (Town will provide the culvert) Cold Plane & Pave- Cold Plane 2-1/4" 3/4" Type IV Shim 1-1/2" Type IV Overlay Shoulder work along entirety of project (to include 2 foot wide compacted material) Provide driveway and side road entrances with 2 foot paved apron shims Painting of line markers Additional Scope of Services: Contractor is responsible for all materials, except for the provided culvert Contractor is responsible for communication with Dig safe before work commences to ensure there are no buried utility lines Contractor is required to provide all traffic control, construction warning signs, and associated barricades and traffic cones All Work for This Project Must Be Completed by December 31 St , 2026 Proposals will be received by the Westford Town Administrator at the Westford Town Office. The Select board plans to review the proposals received and select the firm at their January 8 th or January 22 nd meeting. Proposal amount will be the primary factor in the selection process; however, other factors (e.g., reference checks, etc.) will also be considered. The Town reserves the right to make the selection based on all factors and may not necessarily choose the lowest proposal. The Town reserves the right to reject all proposals deemed not to be in the best interest of the town
Conceptual
Bridges / Tunnels
$500,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 29, 2025
January 28, 2026
VT-128 & Westford-Milton Rd, Westford, VT
Related To This Project
Westford, VT
Bid Date: Apr 07 2025
Westford, VT
Bid Date: Jan 03 2025
Westford, VT
Bid Date: Nov 25 2024
Westford, VT
Bid Date: May 29 2024
Westford, VT
Bid Date: Apr 15 2021
Westford, VT
Bid Date: Apr 15 2021
Westford, VT
Bid Date: Apr 15 2021
Westford, VT
Bid Date: Apr 07 2022
Starksboro, VT
Bid Date: Nov 21 2025
Brattleboro, VT
Bid Date: Nov 21 2025
Burlington, VT
Bid Date: Oct 28 2025
New Haven, VT
Bid Date: Oct 14 2025
Chittenden, VT
Bid Date: Oct 21 2025
Newport, VT
Bid Date: Oct 29 2025
Woodstock, VT
Bid Date: Oct 17 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
