Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 13, 2025 at 7:00 PM
Updated December 14, 2025
Site work and paving for a civil project in Pineville, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
(1): Job J7s3379 Route 43 Mcdonald County. Bridge Replacement and Slope Repair Over Elk River 2 Miles South of Route 76, the Total Length of Improvement Being 0.294 Miles. (2): Job Jsr0172 Route 59 Mcdonald County. Ditch Stabilization 0.5 Mile North of Route Dd Near Noel, the Total Length of Improvement Being 0.215 Miles. Range: $2.5M to $5M Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. DBE Goal Percent: Contract Time: 12/1/26 MO DOT - G07 - Bridge Replacement and Slope Repair, Ditch Stabilization - Route 43, 59 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PN - FAF 59-2(8) Question Deadline 11/07/2025 Submit completed Contractor Questionnaire and/or Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening.
Award
Bridges / Tunnels
$5,125,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 14, 2025
January 13, 2026
Multiple Locations, Pineville, MO
Related To This Project
Pineville, MO
Bid Date: Nov 14 2025
Pineville, MO
Bid Date: Mar 16 2026
Pineville, MO
Bid Date: Mar 16 2026
Pineville, MO
Bid Date: Mar 23 2026
Pineville, MO
Bid Date: Sep 29 2025
Pineville, MO
Bid Date: Aug 25 2025
Pineville, MO
Bid Date: Aug 12 2025
Pineville, MO
Bid Date: Apr 15 2025
Pineville, MO
Bid Date: Mar 24 2025
Pineville, MO
Bid Date: Feb 27 2025
Pineville, MO
--
Pineville, MO
Bid Date: Mar 14 2025
Pineville, MO
Bid Date: Dec 13 2024
Pineville, MO
Bid Date: Aug 08 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
