BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Renovation of a fire / police facility in Athens, Georgia. Completed plans call for the renovation of a fire / police facility.

Facilities Management is accepting bids for the following project: The contractor shall provide all materials, labor, tools, and all incidentals required and/or implied for the complete and satisfactory replacement of the emergency generator and automatic transfer switch at Athens-Clarke County Government Fire Station #9, 1650 Danielsville Road, Athens, GA. Question Submission Deadline:November 4, 2025, 1:00pm Any inquiries concerning this Request for Proposal should be made to Angie Perteet, Senior Buyer, (762) 400-6053, or email accbids@accgov.com. Background Coordination must be included to disconnect the utility power and remove the existing ATS. Also, the contractor must install the new ATS within one 8-hour shift to accommodate the least amount of downtime possible. The contractors price MUST include the following: Delivery of equipment Install exhaust system Natural Gas Hook-Up, Flex Hoses, and Coordination Test system after installation Load Bank Test - 4 Hours Extend Concrete Pad approximately 24" NFPA 110 start up All Testing by the manufacturer. (Contractor may assist the manufacturer in all tests and provide results to ACCGov Facilities Management.) On-site training Remove the old generator and deliver it to ACCGov Auction Barn Any applicable Permits, and applicable State and Local Taxes Temporary Power to job trailers must be included in your total cost. Not included in the scope of work Fuel Piping. It is contractor's responsibility to ensure all equipment is identified and included in their quoted price. 1. MATERIAL AND PARTS: Material and parts shall be new, top quality, and made by or recommended by the original manufacturer of the replaced part of the material. GENERATOR KG150 Kohler Natural Gas Generator 120/208 Volt Three Phase PMG 60 Hz The generator must have the following: natural gas engine with isochronous governor Sound attenuated weather protecting housing Block heater Digital Control Panel 600 amp main line breaker - 80% rated Full safety shutdowns Critical exhaust system - mounted Battery, rack & cables Battery charger with alarms Initial fill of antifreeze and oil One (1) year warranty AUTOMATIC TRANSFER SWITCH 800 amp ASCO Automatic Transfer Switch 120/208 Volt Three Phase Three Pole The automatic transfer switch must have the following: In phase monitor Plant exerciser Time delay engine start Time delay transfer to emergency Time delay retransfer to normal Test switch Nema 1 enclosure One (1) year warranty ACCESSORIES One (1) Owner's Manual E-Stop Remote annunciator 2. SCHEDULING: This job is based on an 8-hour day, 40-hour week. Coordination must be included to disconnect the utility power and remove the existing ATS. The contractor must also install the new ATS with one 8-hour shift to accommodate the least amount of downtime possible. Work Schedule: Except for emergencies or other special situations, contractor shall normally be expected to conform to Athens-Clarke County Government's work schedule, which at present is Monday - Friday, 8:00 a.m. - 5:00 p.m. If overtime labor is required, the additional labor MAY be billed in addition to the contract price. HOWEVER, OVERTIME LABOR MUST BE PRE-APPROVED BY ACCGov FACILITIES MANAGEMENT IN ADVANCE . Storage Facilities: Contractor shall maintain storage for all materials, parts, and tools to repair and service the equipment. These materials shall be located in contractor's vehicle, place of business, or in specially constructed containers at the job site. These containers shall be clearly marked showing the contents and situated in a location designated by Athens-Clarke County Government. If these containers are locked, a key shall be provided to Athens-Clarke County Government. Inspections: Athens-Clarke County Government reserves the right to conduct any test or inspection it may deem advisable to assure supplies and services conform to the specifications. PLEASE NOTE: Any time excavation occurs in an area with unknowns such as rock, sewer lines, electrical services, process pipes, etc., these obstacles are not included in the scope of the original contract. If additional labor and materials are required to accommodate these obstacles, they may be billed as an agreed-upon extra, in addition to the contract price, at the request of ACCGov Facilities Management. CONTRACTOR REQUIREMENTS: Contractor must have three (3) verifiable commercial references pertaining to generator replacement or installation. 100KW - 400KW If contractor has performed this type of work for ACCGov in the past, please list each location and generator size. Contractor must have enough employees so that this job is completed within 7 days, dependent upon the weather. Contractor must have 10+ year of commercial electrical experience. Contractor must be able to test and service the installed generator. Contractor must have Unrestricted Electrical License and submit a copy with the bid. Contractor must be within 100 miles. Contractor must be able to be on-site within 4 hours for warranty work. Contractor must maintain adequate levels of repair parts inventory.

Bid Results

Fire / Police

$146,726.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
328
Active Projects
191
Bidding Soon
2,247
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.