BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Site work and paving for a mixed-use development in Beverly Hills, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Scope of Services includes street and alley repavement at various locations within the City of Beverly Hills. The project includes asphalt grinding, hot mix asphalt installation, concrete pavement removal and replacement, concrete alley gutters removal and replacement, sidewalk removal and replacement, water meter box installation, and curb ramp reconstruction per ADA. The project also has a sidewalk maintenance component requiring the contractor to do repairs citywide based on the City's priority list. Question Deadline 10/23/2025 at 5:00 PM PT Online Q&A Yes Response Types Line Items Type of Award Lump Sum License Requirements a Liquidated Damages $1,500 Project Duration 260 days The work to be done shall consist of furnishing all the required labor, materials, equipment, parts, implements, supplies and permits necessary for, or appurtenant to, the construction and completion of the project indicated above in accordance with Standard Drawings and the Specifications prepared for this project. Any questions or requests for information can be directed to the project manager, Manu Paul S. Dhaliwal, P.E., at mdhaliwal@beverlyhills.org

Bid Results

Roads / Highways

$10,353,333.00

Public - City

Paving, Site Work

3

7

5

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
1
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

December 29, 2025

Project location map

Multiple Locations, Beverly Hills, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.