Published April 16, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of a military facility in Kearneysville, West Virginia. Completed plans call for the renovation of a 190,000-square-foot military facility.

IRSECCROOFREPLACEMENT2026 Complete removal and replacement of all roof areas throughout the IRS Martinsburg Electronic Computing Center, including approximately 190,000 square feet of existing ballasted protected membrane roofing over structurally sloped concrete decks and three small EPDM awning roofs over metal decks. Work includes replacing existing PMR systems, coping, flashing, expansion joints, lightning protection systems, and rooftop unit structural cross-bracing. Additional work includes installing new fixed exterior access ladders, installing a complete fall-protection system around the building perimeter, and replacing all EPDM awning roofs. Future options include incorporating the mechanical-addition roof, adding exterior fixed ladders, and installing perimeter fall protection, which GSA anticipates combining into the base bid. An add alternate for cold-fluid spray-applied waterproofing in lieu of hot-rubberized asphalt may be included in the complete design package. Concrete deck repairs will be priced as unit-cost allowances. All work must comply with all applicable codes, design specifications, and security requirements of a Level 5 facility. Location: IRS Martinsburg Electronic Computing Center 250 Murall Drive, Kearneysville, WV 25430 The estimated price range is $10,000,000 to $15,000,000. Question Deadline 03/30/2026 Submit all questions regarding Phase 1 to the Contracting Officer via email to ching.hung@gsa.gov and cc: jonathan.plotkin@gsa.gov using the Request For Information (RFI) submission form issued as part of the solicitation attachments. Any responses provided by GSA will be posted to SAM.GOV as an Amendment to the Solicitation. We will attempt to expedite our responses as quickly as possible. Submit all questions regarding Phase 1 to the Contracting Officer via email to ching.hung@gsa.gov and cc: jonathan.plotkin@gsa.gov on or before March 30, 2026 using the Request For Information (RFI) submission form issued as part of the solicitation attachments. Any responses provided by GSA will be posted online as an Amendment to the Solicitation. We will attempt to expedite our responses as quickly as possible. The overall roof replacement is about 190,000 SF, including the 2011 addition. In general, the existing roofs consist of ballasted protected membrane roofs (PMR) over structurally sloped concrete slabs. There are also three small awning roofs, totaling roughly 1,300 SF, which consist of EPDM over structurally sloped metal decks, rather than PMR over concrete. The scope of work generally involves the following: Replace existing PMR, coping, flashing, expansion joints, and other roofing accessories Replace lightning protection systems Replace existing rooftop unit structural cross bracing Replace existing EPDM awning roofs Install new fixed exterior access ladders Install new fall protection system throughout building perimeter I.B. The Contract The Contract consists of the SF1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, Amendments, Modifications, and other Attachments identified herein (collectively, the Contract Documents). The Contract contains the entire agreement of the Parties, and no prior written or oral agreement, express or implied, shall be admissible to contradict or modify any part of the Contract. (2) The Contractor shall provide and pay for all labor, materials, equipment, tools, water, heat, utilities, transportation, and other facilities and services necessary for the proper execution of the work described in and reasonably inferable from the Contract Documents (the Work), whether temporary or permanent. In consideration for, and upon condition of, the Contractor's completion of the Work, GSA shall pay the Contractor the price or prices established in Section II, subject to the terms and conditions set forth in this Contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The primary on-site point of contact is the IRS building manager Chris Bunting (304-702-8282). The GSA project manager, Jonathan Plotkin (215-301-7442) will also be on-site during the site visit and will serve as a secondary POC

Post-Bid

Military

$15,000,000.00

Public - Federal

Renovation

71

20

12

5

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
509
Active Projects
229
Bidding Soon
3,127
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2026

June 15, 2026

Project location map

250 Murall Dr, Kearneysville, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.