BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2025 at 7:00 PM

Updated November 23, 2025

Demolition, site work, paving and new construction of a mixed-use development in Spring Arbor, Michigan. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; and bridge / tunnel.

Bridge preventive maintenance and rehabilitation including replacement of hot mix asphalt surface, waterproofing membrane, saline treatment, deck joint replacement, concrete surface coating and approach guardrail on King Road over the north branch of the Kalamazoo River and Tompkins Road over the Grand River, Parnall Road over the Grand River, Rives Eaton Road over the Grand River and Hague Road over the Grand River, Jackson County. 0% Dbe Participation Required Net classification required for this project is 808 Fa Control Sec Job No Federal No BFPO 38000 218245A 25A0932 BFP 38000 218246A 25A0933 Completion Date: 10/30/2026 MIDOT - 2511 036 - Bridge Preventive Maintenance and Rehabilitation Including Replacement of Hot Mix Asphalt Surface, Waterproofing Membrane, Saline Treatment on King Road MBE (5.1%), WBE (6.9%), DBE (0%)

Award

Bridges / Tunnels

$537,124.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

15

7

3

5

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
432
Active Projects
234
Bidding Soon
2,471
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 7, 2025

December 8, 2025

Project location map

King Rd, Spring Arbor, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.