BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Renovation of a municipal facility in Charleston, West Virginia. Working plans call for the renovation of a municipal facility.

**As of November 20, 2025, no bids received . No definite date for the rebid.** Building 10 Holly Grove Renovations For Information Contact the Buyer Tara Lyle (304) 558-2544 tara.l.lyle@wv.gov To extend Technical Questions Due Date from 10/21/2025 to 10/23/25 by 12:00 PM. The Project consists of the construction and renovations of the entire building. Work will include new partitions, new roof, plumbing, HVAC, and electrical work. 1. EXTERIOR a. Roofing and Drainage: 1) Remove, repair, or replace the deficient fascia, soffit, and gutter systems to visually match existing 2) Slate roof repairs on the building's principal massing 3) Protect and reuse all existing gutters where possible. Install matching new drainage where necessary. b. Windows: 1) Evaluate, and repair where necessary 2) Modify the second-story east window where kitchen addition roof restructuring occurs. 3) Rebuild third-story dormer windows over grand staircase where current openings are boarded up with plywood. 4) Install custom in-fill panels within the basement windows where existing plywood fill openings c. Building Access and Entrances: 1) Modifications and upgrades to the existing ADA ramp are required. New Handrail assembly to be installed. 2) New Railing assemblies at rear porches 4) Installation of access control and security cameras 2. INTERIOR a. Walls and Ceilings: 1) Plaster restoration: both crack repair and ceiling removal to facilitate MEP upgrades 2) Replace all drywall and install it in locations that currently have bare framing 3) Reinstall removed trim, mantels, other millwork, etc. b. Doorways and Doors: 1) New doors to be ADA compliant on public entry level 2) Widen selected framed openings to comply with the ADA-accessible route, removing and retaining selected historic doors for reuse with the scheme. Retaining trim pieces, and fabricating matching profiles when necessary. 3) Update hardware and repair historic hardware c. Facilities: 1) Bathroom upgrades on level 1 and level 2 2) New ADA-compliant bathroom on level 1 d. Floors: 1) Patch and restore the existing oak strip floor. 2) Refinish all wood floors 3) Remove existing carpet e. Stair Assemblies: 1) Revise stairs for code compliance: 2) Restore the grand staircase with an additional landing at the bottom step level. Modify bottom landing and add stair carpet runner. 3) Install new handrails/guardrail assembly on exterior stairs and ramp. 4) Install a new concrete ramp at the front door under the portico. 5) Install new railing assemblies and handrails on porches. f. Building Systems: 1) Install All New Plumbing: Sanitary, drain, supply components, and fixtures 2) Install All New Electrical: Complete system upgrade 3) Install All New HVAC: Complete system upgrade 4) Install All New Data/Com/Security system upgrades 5) Install New Fire Alarm and Detection System

Final Planning

Municipal

$200,000.00

Public - State/Provincial

Renovation

99

25

86

3

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
38
Bidding Soon
737
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

May 20, 2026

Project location map

1710 Kanawha Blvd E, Charleston, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.