BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 22, 2025 at 7:00 PM

Updated November 23, 2025

Demolition, site work, new construction and addition to a pre-engineered storage facility in Fort Myers, Florida. Completed plans call for the addition of a pre-engineered storage facility; for the demolition of a pre-engineered storage facility; for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Project Description: Site preparation and construction of a pre-engineered metal building (PEMB) at the Fort Myers Materials Lab Owner representatives will be present to discuss plans, specifications, and conditions of the project. The Owner's Project Manager is: Chad Lewis and may be reached at: D1-contracts@dot.state.fl.us Last Date to Submit Technical Questions: November 4, 2025 at 5:00 Pm via Email to D1-contracts@dot.state.fl.us Each bidder shall submit a current license issued by the State of Florida (specify type license required for the work) and, if a Florida Corporation, a copy of the Corporate Charter as prequalification of their eligibility with the bid document to the Department of Transportation, Contracts Administration Office. The bid will be rejected if a copy of the Contractor's License is not included either with the bid or provided to the Owner prior to the Letting. After the bid opening, the lowest responsive bidder shall qualify in accordance with this contract document. If the bid amount exceeds $100,000, the bidder must provide with the bid, a Bid Guaranty of five percent (5%) of the actual total bid in the form of a certified check, cashier's check, treasurer's check, bank draft of any national or state bank, or a surety Bid Bond made payable to the Department of Transportation. A Bid Guaranty in an amount less than five percent (5%) of the actual bid will invalidate the bid. If the contract award amount exceeds $100,000, both a Performance Bond and a Labor and Material Payment Bond of 100% each of the contract sum are required at the time of award. FDOT - Fort Myers Materials Lab Expansion

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$515,000.00

Public - State/Provincial

Addition, Demolition, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
84
Bidding Soon
1,011
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 19, 2025

December 19, 2025

Project location map

4051 Florida Dot Way, Fort Myers, FL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.