BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work and new construction of a recreation facility in Dryden, New York. Completed plans call for the construction of a one-story above grade recreation facility.

Question Deadline 11/04/2025 Submit questions in writing to NED007@tompkinscortland.edu Drainage, wall waterproofing, masonry. Project Scope Contractor shall provide pricing for all labor, equipment and materials associated with the removal and installation of the drainage system on the entire (East) side of the fieldhouse. Work shall also include washing the CMU and concrete wall, installing a watertight membrane and protection board below grade. Backfilling with drainage stone, hauling any spoils, repointing of all failed mortar joints with mortar that matches as close as possible and sealing the CMU wall. Contractor to follow manufactures instruction for all products and materials. Earthwork- Trench Excavation and Backfill Trench excavation with approximately 18'' wide bucket. Hauling all spoils, shoring, dewatering as needed. Fine grade pipe bedding by hand from loose material piled adjacent to a trench with compaction included. Full restoration. Waterproofing Masonry- Repoint CMU wall, running bond masonry, clean masonry, pressure wash concrete and CMU wall. Apply masonry Penetrating Sealer in accordance to specific wall area. Labor- CMU Sealer coat Single coat applications except as noted. These figures are based on hand work (roller, and brush where required) on commercial jobs. Liquid membrane waterproofing system for foundations wrapped over concrete foundation footings. System should be tied into a perimeter drain system at or around the footing. Cover top of system with at least 6 inches of soil and backfill immediately after installation. All surface preparation, excavation, or backfill included. Materials- Drainage Piping- Filter sock sieve, 4", 100' length Corrugated plastic drainage pipe, plain or perforated and snap-on fittings. Installed in trenches or at foundation footings. All excavation, gravel or backfill included Drainage Piping, Crushed stone fill for drainage systems. Mira Drain 6200 (200 SF Roll) Sure-Seal CCW-201 (or equivalent product to a multi-component, chemical-curing, low-modulus, non-sag, polyurethane sealant especially formulated for dynamically moving joints). The installation of SureSeal Termination Bar and fasteners. (Sure-Seal Termination Bar is an extruded aluminum bar designed for securing and sealing flashing terminations in accordance with current Carlisle Specifications or equivalent). 1"x10' - Corrosion resistant 6063-T6 extruded aluminum - Pre-Punched 6" (150 mm) o.c. and 1" (25 mm) from each end - Sealant ledge to hold the Lap Sealant for stability and to compress the Water Cut-Off Mastic. Owner provided- electric, traffic control, security, water and owner must notify and mark any underground utilities or septic systems.

Award

Amusement and Recreation

$38,721.00

Public - County

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
143
Bidding Soon
1,609
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

January 3, 2026

Project location map

170 North St, Dryden, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.