Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 5, 2025 at 7:00 PM
Updated November 6, 2025
Site work and paving for a road / highway in Denton, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Paving of approximately 91.876 Acres in the Denton County, Texas. Certified/Cashier's check or acceptable bidder's bonds, payment without recourse to the Owner in an amount of not less than five percent (5%) of the total bid submitted must accompany the bid. The amount of said cashier's check or bond will be forfeited to the Owner and the bank or surety shall be liable to the Owner for the amount in the event the successful bidder fails or refuses to enter into a contract or furnish bonds as hereafter required within fifteen (15) days after the date of notice of award. The Owner reserves the right to reject any or all bids and to waive any informalities and technicalities. Questions regarding the project should be directed through online portal or to Derek Troeger, at Kimley-Horn and Associates, Inc. via email at Derek.Troeger@kimley-horn.com or by phone at 469-605-2954. EACH BIDDER MUST BE REPRESENTED AT THIS PRE-BID CONFERENCE EITHER IN PERSON OR ON TEAMS. BIDS WILL NOT BE ACCEPTED FROM ANY BIDDER WHO IS NOT REPRESENTED AT THE PRE-BID CONFERENCE. Subgrade treatment is assumed and should be confirmed against Lime Series Test. Bonds Subtotal - Bonds Bid Summary Total Bid - Sanctuary Phase 1 Paving Subtotal - Bonds Total Calendar Days for Paving Construction Completion: Project Schedule Paving Construction is expected to start around August 2026 Bidder shall provide all schedule items below for consideration and possible accommodation. Earliest Paving Construction start date: Geotechnical testing is by owner. Contractor is responsible for coordination of the owner's geotechnical engineer for all scheduling/testing. Contractor is to notify Owner if the Geotech is responding in a manner that causes delays. Cost of initial construction staking is by Owner. Restakes to be back charged to contractor at Owner's discretion. Contractor is responsible for the dewatering of site within 24 hours of a rain event to allow timely continuation of work. Selection of Contractor will be made based on bid price and schedule provided. Schedule provided shall consider material deliveries required for construction. Contractor shall refer to Alpha Testing Preliminary Geotechnical Report No. W250385 for bidding Fill within TxDOT ROW is approximately 750 CY. Dirt will be made available onsite by the owner and contractor shall be responsible for all hauls and placement CEP25-0051 Question Deadline 10/30/2025 at 5:00 PM CT All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received after ., will not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be wi
Bid Results
Roads / Highways
$4,796,535.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 3, 2025
December 3, 2025
To Be Determined, Denton, TX
Related To This Project
Denton, TX
Bid Date: Nov 03 2025
Denton, TX
--
Denton, TX
Bid Date: Dec 10 2025
Tradition Municipal Utility District No. 2B Grading Operations To Serve Tradition Phase 8B - 5938115
Denton, TX
Bid Date: Nov 12 2025
Denton, TX
--
Denton, TX
--
Denton, TX
Bid Date: Nov 05 2025
Denton, TX
--
Denton, TX
--
Denton, TX
--
Denton, TX
--
Denton, TX
Bid Date: Oct 30 2025
Denton, TX
Bid Date: Oct 17 2025
Denton, TX
--
The Best Gift for Your Business? Seeing the Future of Construction.
We’re unwrapping exclusive project leads early this year. Gain instant access to commercial data that keeps you steps ahead of the competition. Sign up today to see the projects others won't discover until they're already spoken for.
