BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work for a water / sewer project in Chicago, Illinois. Working plans call for site work for a water / sewer project.

The work generally includes but is not limited to: Base Bid: o Panel Patching, approximately 80 SF o Panel Replacement, approximately 70 panels o Tank Exterior Cleaning (all) o Tank Exterior Coating (all) o Miscellaneous repairs including steel bar penetrations (approximately 60 locations) and sealant joint replacement (approximately 100 LF) Alternate: o Removing all existing cladding and support bands, cleaning, and priming the existing exterior shell of the steel tank and recladding the tank with a new horizontal insulated panel externally banded system fabricated by Thermacon or equal in lieu of the base bid items. In accordance with the Metropolitan Pier and Exposition Authority Act (70 ILCS 210/23.1(b)), the Authority has adopted and maintains a Minority- and Women-owned Business Enterprise procurement program for any and all work undertaken by the Authority. The Authority's goals for MBE and WBE participation in the performance of the Services are 25% and 5% respectively. The term of the contract is until project completion. Provide a letter from a surety demonstrating the Respondent's capability to provide a payment and performance bond for construction services, the letter should also state the Respondent's overall bonding capacity. The Authority will accept questions, in writing via e-mail, until 12:00 PM Central Time, on Monday, October 27, 2025. Questions should be submitted in writing to mpeaprocurement@mpea.com. A summary of questions received, noted without source, and answers will be issued as an addendum on the MPEA procurement website by Wednesday, October 29, 2025. The Authority reserves the right to reasonably request additional information or clarification of information provided in the response without changing the terms of the RFP, and also reserves the right to seek new submittals when such a request is in the best interest of the Authority. The Proposer assumes the responsibility for all costs incurred in responding to this RFP. It is understood and agreed that the Authority assumes no liability for the Proposer's costs incurred in responding to this RFP.

Final Planning

Water / Sewer

$400,000.00

Public - City

Site Work

9

7

2

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
465
Active Projects
272
Bidding Soon
3,342
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.