BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Site work for a water / sewer project in Spring, Texas. Completed plans call for site work for a water / sewer project.

Generator Improvements at Lift Stations No. 2, 3 & 4 Question Deadline 11/07/2025 Bidders desiring additional information, explanation, or clarification or interpretation of CONTRACT DOCUMENTS must request it in writing delivered at the earliest practicable date to the Project Officer prior to bid opening.It is the responsibility of each bidder to inquire and make sure it has received all such addenda issued 72 hours or more before the deadline for delivery of bids. SCOPE A. The CONTRACTOR shall provide all Work in accordance with: (i) applicable laws, rules, and regulations,(ii) the codes, standards, recommendations, etc. listed in Section 1.02, below, and (iii) the results of the studies furnished by the ELECTRICAL ENGINEER. The ELECTRICAL ENGINEER shall furnish Short-Circuit and Protective Device Evaluation, Protective Device Coordination, and Arc Flash Hazard Analysis studies (Studies) developed per NFPA 70 and NFPA 70E Standard for Electrical Safety in the Workplace, reference Article 130.3 and Annex D, as further provided in this Section 16015. The ELECTRICAL ENGINEER must furnish a report summarizing the Studies initially in preliminary form and later in final form, as provided below. B. The CONTRACTOR must supply the information required for the Studies as provided in this Section and other provisions in these SPECIFICATIONS. Initially, such information must be provided with the other submittals required by these SPECIFICATIONS (see the provisions requiring CONTRACTOR to submit shop drawings, mill certificates, certified tests, product data, operations and maintenance data, and samples). This information must be sufficient to allow the ELECTRICAL ENGINEER to furnish the report summarizing the Studies in preliminary form. After installation of the equipment and facilities, the CONTRACTOR shall provide additional information about the equipment and facilities as installed as may be required to furnish the report summarizing the Studies in final form.

Bid Results

Water / Sewer

$288,512.00

Public - City

Site Work

15

17

8

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
352
Active Projects
49
Bidding Soon
3,819
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

December 12, 2025

Project location map

Multiple Locations, Spring, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.