Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 25, 2025 at 7:00 PM
Updated November 26, 2025
Renovation of a municipal facility in Kalaupapa, Hawaii. Completed plans call for the renovation of a municipal facility.
**As of November 25, 2025, the project was awarded to BAMAJACK, LLC, with an awarded amount of $22,787.65.** The State of Hawaii Department of Health, Kalaupapa Settlement (DOH) is seeking to remove four (4) existing split-type HVAC units and install four (4) new, energy-efficient split-type HVAC units in Kalaupapa, Molokai, Hawaii that meet all applicable manufacturer, federal, state, and local codes, regulations, and standards. Direct all questions regarding this Solicitation, and any questions or Issues relating to the accessibility of this Solicitation (Including the appendices and exhibits to this Document, and any other document related to this Solicitation), to: Newell, Sara. The State of Hawaii Department of Health, Kalaupapa Settlement (DOH) is seeking to remove four (4) existing split-type HVAC units and install four (4) new, energy-efficient split-type HVAC units in Kalaupapa, Molokai, Hawaii that meet all applicable manufacturer, federal, state, and local codes, regulations, and standards. All labor, equipment, materials, travel, taxes, storage, and delivery costs must be included in the total price. All HVAC units and related equipment and materials must be new. Date of delivery and installation to be determined and coordinated with the General Construction and Maintenance Supervisor, Pa'oneakai Lee-Namakaeha or Kalaupapa Administrator, John Herbstritt. Onsite storage, vehicle transportation, and housing within Kalaupapa Settlement will be provided by DOH. Installation of equipment must be in proper working order including all associated plumbing and electrical. The Contractor shall provide all labor, tools, materials, and equipment for safely removing four (4) existing HVAC units and installing the four new recommended HVAC systems. The Contractor shall install all associated components, including refrigerant lines, electrical connections, controls, and condensate drains. The Contractor shall ensure compatibility with existing power supply.
Award
Municipal
$22,788.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 30, 2025
November 10, 2025
Multiple Locations, Kalaupapa, HI
Related To This Project
Kalaupapa, HI
Bid Date: Sep 13 2024
Kalaupapa, HI
Bid Date: Aug 08 2022
Honolulu, HI
Bid Date: Nov 13 2025
Pearl City, HI
Bid Date: Nov 05 2025
Hawaii National Park, HI
Bid Date: Nov 20 2025
Kailua Kona, HI
Bid Date: Dec 17 2025
Oahu, HI
Bid Date: Nov 12 2025
Pearl City, HI
Bid Date: Nov 05 2025
Honolulu, HI
Bid Date: Nov 13 2025
Oahu, HI
Bid Date: Nov 14 2025
Wahiawa, HI
Bid Date: Nov 14 2025
Honolulu, HI
Bid Date: Nov 19 2025
Kauai, HI
Bid Date: Oct 23 2025
Kailua Kona, HI
Bid Date: Dec 09 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
