BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

This is a service / maintenance or supply contract in Greenville, South Carolina. Contact the soliciting agency for additional information.

The work includes mowing nine flood-control dams and their auxiliary spillways once a year to control woody vegetation that may affect dam structure. The dams are located in the Huff Creek, Rabon Creek, and South Tyger River watersheds and range in size from 2.8 to 11.9 acres. Mowing must be performed in any area where vegetation exceeds 6 inches, including the top of the dam, lake side, downstream side, and auxiliary spillway, except for areas covered with trees. Vegetation must be cut to a maximum height of 6 inches. Trees and brush cut from the lake side must be removed. Disturbed areas must be revegetated with specified seed mixes. Work must commence after Notice to Proceed and be completed within 30 calendar days, with weather delays allowed. The contractor must maintain a five-day work schedule, use equipment safe for steep slopes, and ensure all motorized equipment has rollover protection and seatbelts. Hand cutting is required in tight or specific areas. Final inspection by the District is required for project completion. Vendors must submit a proposal with an overview of their company, qualifications and certifications, at least three references, safety record, and a proposed schedule. Proposals should be organized with specific headings and submitted electronically or in a sealed format prior to the deadline. All licenses and permits must be obtained by the contractor. Inquiries must be submitted through the county's procurement portal. Lump sum pricing is required for each location listed. No bonding is required for this project. As per Adda 2, All inquiries regarding this proposal shall be submitted no later than Tuesday, November 4, 2025, 5:00 pm via the County’s online procurement Portal, located at https://procurement.opengov.com/portal/greenvillecounty. Please note the deadline for submitting inquiries. All answers to inquiries will be posted on the County’s online procurement Portal. Offerors may also click “Follow” on this proposal to receive an email notification when answers are posted. It is the responsibility of the Offeror to check the website for answers to inquiries

Post-Bid

Water / Sewer

$80,000.00

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
127
Bidding Soon
1,328
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2025

December 5, 2025

Project location map

To be determined, Greenville, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.