BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 1, 2025

Site work and paving for a bridge / tunnel in Anola, Manitoba. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000304974 Question Acceptance Deadline 2025/10/28 12:00:00 PM CDT Bridge Rehabilitation of a Three Span Precast Concrete Channel Girder Bridge over Cooks Creek on Provincial Road 213, located in Section 31-11-06E, Municipality of Springfield, Bridge Site No. 4324-10. Completion Model The Contract Will Be Assessed Liquidated Damages in Accordance With the Specification for Liquidated Damages - Completion Specified by Completion Date. Completion Dates and Liquidated Damages Sub Completion 1 All Work Including Existing Girder Removal and New Girder Installation, Abutment Backfill Shall Be Completed by No Later Than March 28, 2026. Daily Liquidated Damages After This Specified Final Completion Date Will Be Charged to the Contractor at the Rate of One Thousand ($1,000.00) Dollars Per Calendar Day Until the Work is Completed. Completion All Remaining Work Shall Be Completed by No Later Than June 30, 2026. Daily Liquidated Damages After This Specified Final Completion Date Will Be Charged to the Contractor at the Rate of One Thousand ($1,000.00) Dollars Per Calendar Day Until the Work is Completed. The Maximum Liquidation Damage Charged at Any Given Time Shall Be One Thousand ($1,000.00) Dollars Per Calendar Day Until the Work is Completed. Notwithstanding the Specifications for Liquidated Damages, Liquidated Damages Will Be Assessed for Each and Every Calendar Day (Including During Seasonal Shut Down and Spring Road Restrictions) That the Contractor Has Not Completed the Work After the Completion Date. Liquidated Damages Will Be Charged for Saturdays and/or Sundays Whether the Contractor Elects to Work Those Days or Not. Seasonal Shutdown Date The Seasonal Shutdown Date for Applicable Roadwork is: October 15 of Any Given Year. Docs can be obtained from https://www.merx.com/mbgov/solicitations/open-bids/MINOR-STRUCTURE-REHABILITATION-ON-PR-213-OVER-COOKS-CREEK-RM-OF-SPRINGFIELD/0000304974 and bid submissions must be done through the Merx platform. Award is subject to final approval

Award

Bridges / Tunnels

$208,250.00

Public - State/Provincial

Paving, Site Work

16

3

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
2
Bidding Soon
285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

December 1, 2025

Project location map

Multiple Locations, Anola, MB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.