BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2025 at 8:00 PM

Updated October 19, 2025

Site work and paving for a road / highway in Hempstead, New York. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project proposes to apply a preventative maintenance treatment to seal cracks and joint overlays and limited pavement repairs. This work will help to maintain and extend the life of the pavement surface and keeps the highway system in a state of good repair. 1. NY878 (Nassau Expressway) from Burnside Avenue to Rockaway Boulevard in the Town of Hempstead, Nassau County 2. Meadowbrook State Parkway from Merrick Road to NY27 (Sunrise Highway) in the Town of Hempstead, Nassau County 3. NY106 (Newbridge Road) from NY105 (Jerusalem Avenue) to NY24 (Hempstead Turnpike) in the Town of Hempstead, Nassau County 4. Northern State Parkway from Meadowbrook State Parkway to Wantagh State Parkway including ramps in the Town of North Hempstead, Nassau County 5. Southern State Parkway from Exit 32(NY110) to Exit 39 (NY231) in the Town of Babylon, Suffolk County 6. Robert Moses Causeway from Ocean Parkway to the beginning of the Great South Bay Bridge in the Town of Islip, Suffolk County 7. Robert Moses Causeway from the end of the Great South Bay Bridge to NY27A (Montauk Highway) in the Town of Islip, Suffolk County 8. NY454 (Veteran's Memorial Highway) from NY25 (Jericho Turnpike) to CR108 (Old Willets Path) in the Town of Smithtown, Suffolk County 9. NY25 (Middle Country Road) from CR83 (Patchogue-Mount Sinai Road) to Coram Mt. Sinai Road in the Town of Brookhaven, Suffolk County. NYSDOT Region: 10 Long Island The current status of the project is Future Development. The Bid Opening is expected to be in Spring 2027. Construction is expected to begin in Spring 2027. Construction is expected to be completed in Winter 2027/2028. As of October 18, 2025, the project is in Conceptual status. Anticipated letting Year is 2027. NYDOT : Crack Sealing Contract *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$8,000,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
932
Active Projects
508
Bidding Soon
7,054
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2027

Project location map

Multiple Locations, Hempstead, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.