BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2025 at 8:00 PM

Updated November 15, 2025

Demolition, site work and paving for a mixed-use development in Laurel, Montana. Completed plans call for the demolition of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The project consists of existing structure demolition, curb and gutter demolition, asphalt demolition, and existing FETS removal. Work shall also include a modified diversion structure, modified diversion structure gates, 24 x 48 Waterman SS-257-1 gate, precast diversion structure, cast in place weir wall, precast diversion structure grates, precast diversion structure overflow pipe, 42 x 60 Waterman SS-251-1 slide gate, and a 30 x 42 Waterman SS-251-1 slide gate. Additional improvements include a proposed parking area and approach, excavation and backfill, ~70 CY crushed road base, 22 Tons asphalt PG 58-28, ~68 LF of curb and gutter, ~543 LF of 43.8 x 26.6 concrete arch pipe, ~559 LF of 78.5 x 51.8 of concrete arch pipe, ~272 CY of crushed limestone and ~2,445 SY of 8-oz woven separation fabric. Est. Completion Date: April 1, 2026 Questions relative to this project should be direct to Douglas C. Tamcke at (406) 461-7856 or dtamcke@tripletreemt.com. Question Deadline 10/28/2025 at 5:00 PM MT

Post-Bid

Sidewalks / Parking Lot

$70,000.00

Public - City

Demolition, Paving, Site Work

19

9

12

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
5
Bidding Soon
94
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2025

December 1, 2025

Project location map

115 W 1st St, Laurel, MT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.