BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 2, 2026 at 7:00 PM

Updated January 3, 2026

Renovation of a mixed-use development in Blue Springs, Missouri. Completed plans call for the renovation of a educational facility.

for partial roof replacement at Blue Springs High School (+7-13,214 sq/ft), James Walker Elementary (+/-4.060 sq/ft). Cordill-Mason Elementary (+Z-4.542 sq/ft), William Bryant Elementary (+/-3.106 sq/ft), Daniel Young Elementary (+/-6.531 sq/ft). Project reviews of each facility on October 23. 2025 as a group will immediately follow. The Board reserves the right to reject any or all bids and to waive any informality or technicality in bidding, if it is in their best interest to do so. No bid shall be withdrawn after the opening bid without consent of the Board of Education, for a period of sixty (60) days after the scheduled time of closing bids. The current prevailing wage rates as determined by the State of Missouri, Division of Labor, shall apply to this project.

Bid Results

Educational

$1,671,080.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
0
Bidding Soon
755
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

December 5, 2025

Project location map

Multiple Locations, Blue Springs, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.