Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published January 29, 2026 at 7:00 PM
Updated January 30, 2026
Site work for a water / sewer project in Amesville, Ohio. Working plans call for site work for a water / sewer project.
**As of January 29th, 2026, the project was temporarily pulled out from the bidding. No definite date for the rebid.** All questions during bidding should be addressed to Michael Ford Daniel Konschak, who can be reached at 440-344-7524. The Project consists of all labor, materials, and services necessary to install solar photovoltaic systems at 2 sites within the Village of Amesville and 3 sites within the Village of Coolville. In Amesville Site A1 is across from the Amesville Elementary School (23 Main St. Amesville, OH 45711). Site A2 is behind the Amesville Fire Department (18 Maple, Amesville, OH 45711). The locations for solar photovoltaic panels in Coolville are Site C1 at east end of the Village of Coolville, (near 2737 Main St. Coolville, OH 45723), Site C2 on Rock Road behind the Coolville Elementary School (26461 Main St. Coolville, OH 45723) and Site C3 across from the local Pallet Store (26096 Main Street, Coolville OH 45723). The current negotiated goal by Ohio EPA for construction related activities is 5.4% (the total goal is based on 3.1% of MBEs and 2.3% of WBEs participation). Question Deadline 11/07/2025 at 2:00 PM ET All questions must be submitted electronically to amesvillecouncilpres@gmail.com by 2:00 p.m. five (5) days prior to the Response Deadline. The Village of Amesville is soliciting proposals to install solar arrays at the WWTP sites for the Village of Amesville and the Village of Coolville. The potential sitesfor array installations include: Amesville Sites (~18 kW, estimated 44 total panels)Site A1: 32 panels installed across from Amesville Elementary School (23 Main St.).Site A2: 12 panels installed behind the Amesville Fire Department (18 Maple St.).Coolville Sites (~75 kW, estimated 160 total panels) Site C1: 28 panels installedacross from the local Pallet Store (26096 Main St.). Site C2: 120 panels installed onRock Road behind Coolville Elementary School (26461 Main St.). Site C3: 12 panels installed at the east end of the village (2737 Main St.). Proposals must limit their cost to below $325,000 while providing all labor, materials, and services to install solar photovoltaic systems at multiple sites in the Village ofAmesville and the Village of Coolville. The project goals include: 1) Generate clean and renewable energy to offset operational costs. 2) Demonstrate the City's commitment to sustainability and environmental responsibility. 3) Facilitate resiliency through potential future back-up capability when the grid isdown. 4) Provide an opportunity to shadow the installation process by recent participantsin the grant-funded solar installer certification course hosted by the Village of Amesville. Any additional questions, please contact the Village Council President at amesvillecouncilpres@gmail.com. Answers to questions will be published on theproject webpage for all potential respondents to have the same information.
Final Planning
Water / Sewer
$325,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 14, 2025
July 29, 2026
Multiple Locations, Amesville, OH
Related To This Project
Amesville, OH
Bid Date: Feb 01 2026
Amesville, OH
Bid Date: Jun 01 2026
Amesville, OH
--
Amesville, OH
--
Amesville, OH
Bid Date: Jul 17 2025
Amesville, OH
Bid Date: Feb 23 2023
Amesville, OH
Bid Date: Apr 14 2022
Mount Vernon, OH
--
Fremont, OH
Bid Date: Nov 05 2025
Columbus, OH
Bid Date: Nov 13 2025
Chillicothe, OH
Bid Date: Oct 28 2025
Beavercreek, OH
--
Westerville, OH
Bid Date: Oct 22 2025
Madison, OH
Bid Date: Nov 05 2025
Miamisburg, OH
Bid Date: Nov 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
