Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 5, 2026 at 8:00 PM
Updated June 10, 2026
Site work and new construction of a power facility in Amesville, Ohio. Working plans call for the construction of a power facility; and for site work for a power facility.
As of June 5, 2026 no bids received no definite date for the rebid. The potential sites for array installations include: Amesville Sites Site A1: ~10.5 kW installed across from Amesville Elementary School (23 Main St.). Site A2: ~12 kW installed behind the Amesville Fire Department (16 Maple St.). Coolville Site Site C1: ~50+ kW installed on Rock Road behind Coolville Elementary School (26461 Main St.). The Project consists of all labor, materials, and services necessary to install solar photovoltaic systems at 2 sites within the Village of Amesville and 1 site within the Village of Coolville. In Amesville Site A1 is across from the Amesville Elementary School (23 Main St. Amesvile, OH 45711). Site A2 is behind the Amesville Fire Department (18 Maple St., Amesville, OH 45711). The location for solar photovoltaic panels in Coolville is on Rock Road behind the Coolville Elementary School (26405 Main St. Coolville, OH 45723). Proposals must limit their cost to below $320,000 while providing all labor, materials, and services to install solar photovoltaic systems at multiple sites in the Village of Amesville and the Village of Coolville. The project goals include: 1) Generate clean and renewable energy to offset operational costs. 2) Demonstrate commitment to sustainability and environmental responsibility. 3) Facilitate resiliency through potential back-up capability when the grid is down. 4) Provide an opportunity to shadow the installation process by recent participants in the grant-funded solar installer certification course hosted by the Village of Amesville. Any questions and answers will be provided by email to all individuals who request the RFP package. There will be no pre-proposal meeting for this project. For any additional information, and to request an electronic Request for Proposal or other project specifics, please contact the Project Manager Michael Yandrich, PE at mjy@nrenginc.com or call 740-566-5699.
Final Planning
Solar Power Generation
$320,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2026
December 4, 2026
Multiple Locations, Amesville, OH
Related To This Project
Amesville, OH
--
Amesville, OH
Bid Date: Feb 01 2026
Amesville, OH
Bid Date: Nov 14 2025
Amesville, OH
--
Amesville, OH
Bid Date: Jul 17 2025
Amesville, OH
Bid Date: Feb 23 2023
Amesville, OH
Bid Date: Apr 14 2022
Rocky River, OH
--
Perrysburg, OH
Bid Date: Apr 07 2026
Medina, OH
Bid Date: Apr 09 2026
Rocky River, OH
--
Columbus, OH
Bid Date: Apr 16 2026
Cleveland, OH
--
Edon, OH
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
