Published January 29, 2026 at 7:00 PM

Updated January 30, 2026

Site work for a water / sewer project in Amesville, Ohio. Working plans call for site work for a water / sewer project.

**As of January 29th, 2026, the project was temporarily pulled out from the bidding. No definite date for the rebid.** All questions during bidding should be addressed to Michael Ford Daniel Konschak, who can be reached at 440-344-7524. The Project consists of all labor, materials, and services necessary to install solar photovoltaic systems at 2 sites within the Village of Amesville and 3 sites within the Village of Coolville. In Amesville Site A1 is across from the Amesville Elementary School (23 Main St. Amesville, OH 45711). Site A2 is behind the Amesville Fire Department (18 Maple, Amesville, OH 45711). The locations for solar photovoltaic panels in Coolville are Site C1 at east end of the Village of Coolville, (near 2737 Main St. Coolville, OH 45723), Site C2 on Rock Road behind the Coolville Elementary School (26461 Main St. Coolville, OH 45723) and Site C3 across from the local Pallet Store (26096 Main Street, Coolville OH 45723). The current negotiated goal by Ohio EPA for construction related activities is 5.4% (the total goal is based on 3.1% of MBEs and 2.3% of WBEs participation). Question Deadline 11/07/2025 at 2:00 PM ET All questions must be submitted electronically to amesvillecouncilpres@gmail.com by 2:00 p.m. five (5) days prior to the Response Deadline. The Village of Amesville is soliciting proposals to install solar arrays at the WWTP sites for the Village of Amesville and the Village of Coolville. The potential sitesfor array installations include: Amesville Sites (~18 kW, estimated 44 total panels)Site A1: 32 panels installed across from Amesville Elementary School (23 Main St.).Site A2: 12 panels installed behind the Amesville Fire Department (18 Maple St.).Coolville Sites (~75 kW, estimated 160 total panels) Site C1: 28 panels installedacross from the local Pallet Store (26096 Main St.). Site C2: 120 panels installed onRock Road behind Coolville Elementary School (26461 Main St.). Site C3: 12 panels installed at the east end of the village (2737 Main St.). Proposals must limit their cost to below $325,000 while providing all labor, materials, and services to install solar photovoltaic systems at multiple sites in the Village ofAmesville and the Village of Coolville. The project goals include: 1) Generate clean and renewable energy to offset operational costs. 2) Demonstrate the City's commitment to sustainability and environmental responsibility. 3) Facilitate resiliency through potential future back-up capability when the grid isdown. 4) Provide an opportunity to shadow the installation process by recent participantsin the grant-funded solar installer certification course hosted by the Village of Amesville. Any additional questions, please contact the Village Council President at amesvillecouncilpres@gmail.com. Answers to questions will be published on theproject webpage for all potential respondents to have the same information.

Final Planning

Water / Sewer

$325,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
114
Bidding Soon
2,423
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2025

July 29, 2026

Project location map

Multiple Locations, Amesville, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.