BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 8, 2025 at 7:00 PM

Updated December 9, 2025

Site work for a water / sewer project in China, Texas. Completed plans call for site work for a water / sewer project.

As of December 08, 2025, this project has not yet been awarded. A timeline for award has not yet been established. The City of China, Texas will accept sealed bids for furnishing necessary materials, equipment, superintendence and labor for the City of China, Texas 0.5 MGD Waste-water Treatment Plant Improvements ARPA & TWDB Funded Project. The Project is generally described as the construction of a new 0.5 MGD waste-water treatment plant, per technical specifications in the contract documents for the City of China, Texas. This project is divided into Phase 1 and 2, so as to keep the two sources of funding for related improvements separate from one another. Phase 1 of the proposed WWTP will be funded from the Jefferson County's American Rescue Plan (ARPA) grant funds and will relate to Bid Package A of the proposal form. Phase 2 of the proposed WWTP will be funded by the Texas Water Development Board (TWDB) Clean Water State Revolving Fund (CSWRF) and will re-late to Bid Package B of the proposal form. The right is reserved by the City of China, as the City's interest may require, to accept or reject any or all bids, and to waive any informality in the bids received. Bid Security, only in the form of 1) a certified or cashier's check drawn on a Texas bank and made payable to the City of China; or 2) a bond executed by a surety company authorized to do business in Texas, in the amount of not less than five (5%) percent of the total bid, must accompany each bid at the time it is submitted Bids must be submitted on the form shown in the Contract Documents. A Contractor Qualification Statement must also accompany each bid. Bids may be held by the City of China for a period not to exceed 60 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder's qualifications prior to the contract award. Time for receiving bids is subject to change pending review and approval of the plans and specifications by the Texas Water Development Board. This contract is subject to the Environmental Protection Agency's (EPA) Disadvantaged Business Enterprise (DBE) Program, which includes EPA-approved fair share goals toward procurement of Minority and Women-owned Business Enterprise M/WBE) businesses. Upon award, the successful bidder will be required to furnish payment and perfor-mance bonds. Question Deadline 11/09/2025 Questions received less than ten days prior to the date for opening of Bids may not be answered. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Bid Result - BASE BID PACKAGE A - ALLCO, LLC - $5,335,359.00 BASE BID PACKAGE B - ALLCO, LLC - $4,962,571.00

Bid Results

Water / Sewer

$10,297,930.00

Public - City

Site Work

166

26

331

6

Subscribe For Documents

93 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
314
Active Projects
163
Bidding Soon
2,878
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2025

February 2, 2026

Project location map

To Be Determined, China, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.