Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 14, 2025 at 7:00 PM
Updated November 15, 2025
Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a one-story above grade educational facility.
Kinzie ES - Vacuum Condensate Station Replacement. Only prequalified various trades may participate. Mandatory walkthrough is required at Kinzie ES, 5625 South Mobile Avenue, Chicago, IL 60638. Bids must be submitted electronically via Bonfire. Question Deadline 11/04/2025 All questions/requests must be received two (2) business days prior to bid closing. Pre-qualification requirements: Only prequalified bidders are eligible. Overview of Project: This scope of work covers the supply, installation, and commissioning of a new vacuum pump with condensate return capabilities, including all associated piping, electrical connections, and removal and disposal of existing equipment. 1) Supply and install new vacuum pump unit with integrated condensate return capabilities 2) Unit to comply with specifications outlined in Section 23 22 14 for vacuum condensate pump units. 3) Include all factory-furnished accessories: thermometer, vacuum gauge, gage glass, air-suction check valve, lifting eyes, companion flanges, low-water cutoff switch, cooling-water control, air vent, overflow drain, inlet strainer, discharge valves, vacuum and float controls, and vacuum breaker. 4) Install new piping connections per Section 23 22 13 specifications 5) Provide complete electrical hookup including factory-wired control panel, field power connections, motor starters, control wiring, and Building Automation System (BAS) interface (if applicable) per Division 23 requirements 6) Safely disconnect and remove pre-existing condensate pump including all associated piping and electrical connections, coordinate shutdown procedures to minimize system disruption, turn over removed equipment to CPS Facilities team for storage, and properly cap and secure all disconnected utilities 7) Contractor to secure necessary permits. 8) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 9) Not responsible for contractor errors as a result of non-field verification. 10) Materials and installation must comply with CPS Standards and Specifications as listed on a) SECTION 23 22 14 STEAM AND CONDENSATE HEATING SPECIALTIES b) SECTION 23 22 13 STEAM AND CONDENSATE HEATING PIPING 11) Secure job site overnight if work is not completed in one day. 12) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 13) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 14) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 15) Contractor is to remove and dispose of materials torn out and any construction debris. 16) All trash must be removed off-site by contractor. 17) Clean the surrounding area and make sure all is swept of debris. 18) All questions/requests must be received two (2) business days prior to bid closing
Bid Results
Educational
$49,365.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 6, 2025
December 8, 2025
5625 S Mobile Ave, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Nov 06 2025
Chicago, IL
Bid Date: Nov 06 2025
Chicago, IL
Bid Date: Nov 25 2025
Chicago, IL
--
Chicago, IL
Bid Date: Dec 08 2025
Chicago, IL
--
Chicago, IL
Bid Date: Nov 04 2025
Chicago, IL
Bid Date: Dec 29 2025
Chicago, IL
Bid Date: Nov 06 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Nov 06 2025
Chicago, IL
Bid Date: Oct 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.