BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 5, 2025 at 7:00 PM

Updated December 6, 2025

This is a service / maintenance or supply contract in Naples, Florida. Contact the soliciting agency for additional information.

As requested by the Public Utilities Engineering and Project Management Division (hereinafter, the "Division or Department"), the Collier County Board of County Commissioners Procurement Services Division (hereinafter, "County") has issued this Request for Professional Services (hereinafter, "RPS") with the intent of obtaining proposals from interested and qualified Consultants in accordance with the terms, conditions and specifications stated or attached. The Consultant, at a minimum, must achieve the requirements of the Scope of Services stated herein. All references to "Proposer" are also referred to as "Consultant," "Firm," "Offeror," "Contractor," and "Vendor." Collier County Public Utilities Division is charged with providing water, wastewater, and irrigation quality water facilities necessary to accommodate the rapid development growth occurring in the northeast area of the County. The need for additional facilities in the northeast was developed in the 2003 Water and Wastewater Master Plan Updates adopted by the Board of County Commissioners (BCC) in May 2004. Each year, the BCC confirms the need for and timing of the water and wastewater facilities by way of the Annual update and Inventory Report (AUIR). The awarded firm will provide Construction Engineering and Inspection ("CEI") services for the following projects: Northeast County Regional Water Treatment Plant (NECRWTP) - (County's Engineer of Record is Carollo Engineers) Northeast County Water Reclamation Facility (NECWRF) - (County's Engineer of Record is Carollo Engineers) Northeast Common Facilities at the NECRWTP and NECWRF site- (County's Engineer of Record is Carollo Engineers) Wellfield projects providing water to the NECRWTP and NECWRF plants (County's Engineer of Record is CDM Smith) Projects are the following: NESA South Wellfield Phase 1 Improvements NESA Perimeter Wellfield Phase 2 Improvements Interim Wastewater Treatment Plant (WWTP) (County's Engineer of Records are Carollo Engineers and CDM Smith) A firm, or its affiliate, that is the Engineer of Record (EOR) on any of the projects listed herein shall not be considered eligible to compete as a consultant, CEI. Question Submission Deadline:November 14, 2025, 5:00pm

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
49
Bidding Soon
555
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 5, 2027

Project location map

To Be Determined, Naples, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.