BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 30, 2026 at 7:00 PM

Updated January 31, 2026

Site work for a development in Naples, Florida. Completed plans call for site work for a development.

Replace and properly position new fountain systems with matching pumps and controls at two ponds, including pond edge stabilization at one pond, both located on the main government campus. The vendor must at a minimum achieve the requirements of the Specifications or Scope of Work stated. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. As per Adda 1. Question Submission Deadline: December 16, 2025, 3:00pm Direct questions related to this Bid to Online Bidding System website Project Locations: o Jail Pond o Building F Pond General Description: The Contractor shall provide all-inclusive, turnkey services, including all labor, materials, equipment, permits, and any necessary incidentals necessary to replace the existing fountains and related equipment with new systems at the Jail and Building F ponds. Maps with work locations are attached. All work shall be performed in accordance with industry standards and applicable codes. Jail Pond Scope: o Remove and dispose of the existing fountain and associated equipment. o Supply and install one (1) new "Firestone" 5 HP 60hz horizontal fountain. o Position and adjust the new fountain to minimize overspray and prevent water from reaching outside the pond perimeter. o Replace the pond pump and all associated equipment with new components compatible with the new fountain. Building F Pond Shoreline Stabilization: 1. Supply and install approximately 300 linear feet of 6-foot-wide heavy-duty erosion control geotextile barrier fabric, installed per industry standards. 2. Cover the geotextile fabric with 6"-12" riprap stone to achieve a stable slope and prevent further shoreline erosion. 3. Key in the geotextile fabric at both the top and bottom of the slope. 4. All riprap stone shall be properly chinked to ensure stability. 5. Contractor shall submit specifications for the proposed geotextile fabric with the bid submission. Fountain Replacement: 1. Remove the existing fountain and install a new "Firestone" 1 HP 60hz horizontal fountain. 2. Adjust and position the fountain to minimize overspray and prevent water from leaving the pond area. 3. Replace the pond pump and all associated equipment with new components compatible with the new fountain. Additional Requirements: o Measurements to be taken during the site visit. o Provide all required labor, materials, tools, and equipment. o Remove and haul away all debris from the job site. o Include any permitting required to complete the work.

Award

Conservation and Development

$80,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
47
Bidding Soon
540
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

January 19, 2026

Project location map

Multiple Locations, Naples, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.