Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 23, 2025 at 7:00 PM

Updated December 24, 2025

Site work for a water / sewer project in Surgoinsville, Tennessee. Completed plans call for site work for a one-story above grade water / sewer project.

**As of December,23,2025 this project has not yet been awarded. A timeline for the award has not yet been established.** The work to be bid on is the installation of the Highland Avenue Pump Station. The allotted time for construction is 60 calendar days. Bidders must submit separate sealed bids. The OWNER reserves the right to waive any informalities or reject all bids. No bidder may withdraw their bid within 60 days after the bid submittal date. Copies of the contract documents may be obtained at the issuing office upon payment of $150. Any bidder who returns the contract documents in good condition within 10 days after bid opening will be refunded their payment. Non-bidders will not be refunded. The project is being funded by the Owner. Question Deadline 10/30/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. Bidder shall conduct the required Site visit during normal working hours and shall not disturb any ongoing operations at the Site. The site is listed above and can be found on the Drawings.

Bid Results

Water / Sewer

$103,990.00

Public - County

Site Work

3

18

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

December 8, 2025

Project location map

Highland Ave, Surgoinsville, TN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed