Site work for a road / highway in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway.

The work generally consists of the following: Restoration - 1 LS, Traffic Control - 1 LS, Removing Traffic Signal Cabinet Miller Park Way & Westchester St - 1 EA, Removing Traffic Signal Cabinet Miller Park Way & Target Dwy - 1 EA, Removing Traffic Signal Cabinet Miller Park Way & Burnham St - 1 EA, Removing Traffic Signal Cabinet Miller Park Way & Pick N Save Dwy - 1 EA, Removing Traffic Signal Cabinet National Ave & Old 43rd St - 1 EA, Removing Traffic Signal Cabinet National Ave & 41st St - 1 EA, Removing Traffic Signal Cabinet Greenfield Ave & 41st St - 1 EA, Removing Existing EVP Detectors and EVP Cable Miller Park Way & Westchester St - 1 EA, Removing Existing EVP Detectors and EVP Cable Miller Park Way & Greenfield Ave - 1 EA, Removing Existing EVP Detectors and EVP Cable Miller Park Way & Target Dwy - 1 EA, Removing Existing EVP Detectors and EVP Cable Miller Park Way & Burnham St - 1 EA, Removing Existing EVP Detectors and EVP Cable Miller Park Way & Menards Dwy - 1 EA, Removing Existing EVP Detectors and EVP Cable Beloit Rd & Greenfield Ave - 4 EA, Conduit Rigid Nonmetallic Schedule 40 2-Inch - 171 LF, Conduit Special 2-Inch - 621 LF, Pull Boxes Steel 24x42-Inch - 5 EA, Traffic Signal EVP Detector Cable - 3,454 LF, Field System Integrator - 1 EA, ITS Documentation - 1 EA, Communication Vault Type 1 - 8 EA, Install Camera Assembly - 7 EA, Install Fiber Optic Cable Outdoor Plant 36-CT - 11,111 L.F., Fiber Optic Splice Enclosure - 8 EA, Fiber Optic Splice - 72 EA, Communication System Testing - 1 EA, Install Ethernet Switches - 11 EA, Install Wireless Antennas - 8 EA, Install Cellular Modems - 1 EA, Install Fiber Optic Communications in Cabinet Miller Park Way & National Ave - 1 EA, Install Fiber Optic Communications in Cabinet Miller Park Way & Westchester St - 1 EA, Install Fiber Optic Communications in Cabinet Miller Park Way & Greenfield Ave - 1 EA, Install Fiber Optic Communications in Cabinet Miller Park Way & Target Dwy - 1 EA, Install Fiber Optic Communications in Cabinet Miller Park Way & Mitchell St - 1 EA, Install Fiber Optic Communications in Cabinet Miller Park Way & Burnham St - 1 EA, Install Fiber Optic Communications in Cabinet Miller Park Way & Menards Dwy - 1 EA, Install Fiber Optic Communications in Cabinet Miller Park Way & Pick N Save Dwy - 1 EA, Install Village Furnished EVP Detector Heads - 18 EA, Install Village Furnished Traffic Signal Cabinet and Controller Miller Park Way & Westchester St - 1 EA, Install Village Furnished Traffic Signal Cabinet and Controller Miller Park Way & Target Dwy - 1 EA, Install Village Furnished Traffic Signal Cabinet and Controller Miller Park Way & Burnham St - 1 EA, Install Village Furnished Traffic Signal Cabinet and Controller Miller Park Way & Pick N Save Dwy - 1 EA, Install Village Furnished Traffic Signal Cabinet and Controller National Ave & Old 43rd St - 1 EA, Install Village Furnished Traffic Signal Cabinet and Controller National Ave & 41st St - 1 EA, Install Village Furnished Traffic Signal Cabinet Greenfield Ave & 41st St - 1 EA, Install Village Furnished Traffic Signal Controller Miller Park Way & Greenfield Ave - 1 EA, Install Village Furnished Traffic Signal Controller Miller Park Way & Mitchell Ave - 1 EA, Install Village Furnished Traffic Signal Controller Beloit Rd & Greenfield Ave - 1 EA, Install Village Furnished EVP Discriminators - 3 EA, Remove Cable - 8,646 LF, Remove Radio Antenna - 2 EA, Utility Line Opening - 1 EA, Install Conduit Into Existing Item - 5 EA, Electrical Wire Lighting 12 AWG - 5,841 LF \ This project is being funded by the Wisconsin DOT through a grant received by the Village of West Milwaukee. All Contractors bidding on this project shall be prequalified to perform work on Wisconsin DOT projects. Bids shall be accompanied by Bid Security in the form of a bid Bond, certified check, or cashier's check made payable to the Village of West Milwaukee in an amount of 5 percent (5%) of the Bidder's maximum Bid price. If the successful bidder fails to execute the contract and furnish the required bonds within 10 days after the Award, the Check or Bid Bond shall be forfeited to the Village as liquidated damages. Bids shall be submitted on the bid form provided and all blanks must be filled in for the bid to be accepted. No bid may be withdrawn for a period of 60 days from the date of the bid opening. The Village reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time or changes in the Work and the right to disregard all nonconforming, non-responsive, unbalanced or conditional Bids and the right to accept the Bid and Bids which best serve the interests of the Village. QUESTIONS ABOUT THIS PROJECT PLEASE CONTACT: JOHN BRUGGEMAN, P.E., PTOE TRAFFIC ENGINEER WEST MILWAUKEE

Bid Results

Roads / Highways

$434,585.00

Public - City

Site Work

26

6

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
215
Bidding Soon
2,658
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2025

December 5, 2025

Project location map

I-94, Milwaukee, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.