Updated November 15, 2025

Renovation of a transportation facility in Milwaukee, Wisconsin. Completed plans call for the renovation of a one-story above grade transportation facility.

ETU776 Trip Unit Replacement and Testing (Regulator Building) for Milwaukee County's General Mitchell Airport (5300 S. Howell Ave., Milwaukee WI 53207) ETU776 Trip Unit Replacement and Testing (Regulator Building) This project specification identifies the removal, replacement and primary injection testing of five ETU776 trip units (Part Number WLETU776MP) located in the Regulator Building. Work must comply within compliance of all industry standards. Equipment Identification o MSB/A&B Tie Breaker o MSB/A Main Breaker o MSB/A PP/1 Breaker o MSB/A Transformer #2 Breaker o MSB/B 480V Bus Breaker Removal of Existing Trip Units o De-energize and apply lock-out/tag-out on each breaker per NFPA 70E safety procedures. o Document "as-found" protective device settings; retrieve and record existing trip settings. o Remove breaker covers and existing ETU776 trip units carefully to avoid disturbing adjacent devices. o Label and bag all mounting hardware to maintain proper assembly order and prevent loss. Installation of New Trip Units o Inspect mounting surfaces for damage or debris; clean and prepare as necessary. o Mount new WLETU776MP trip units and apply manufacturer-specified torque values. o Reinstall breaker covers and verify proper gasket sealing. o Load manufacturer's default settings or input documented "as-found" settings if engineeringprovided values are unavailable. Primary Injection Testing o Provide test power (up to 150 kW/125 A at 480 VAC single-phase) within 50 ft of equipment. o Conduct tests per NETA Maintenance Testing Specifications (Section 4.0 Repair): o Verify pickup values at 80 %-120 % of trip unit rating. o Measure trip timing curves for phase and ground elements. o Compare test results to engineering or manufacturer settings; adjust if deviations exceed tolerances, then retest. o Record all test data, including "as-found" vs. "as-left" values, using approved test software. Quality Assurance & Reporting o Ensure all test instruments are calibrated with traceability to NIST standards (NETA Section 5.3). o Compile a comprehensive report detailing settings, test results, adjustments, and corrective actions. o Include photo documentation of each installed trip unit and test setup for verification Question Deadline 11/06/2025 at 10:30 AM CT

Award

Transportation Terminals

$43,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
488
Active Projects
256
Bidding Soon
2,454
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2025

December 10, 2025

Project location map

5300 S Howell Ave, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.