Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a one-story above grade water / sewer project.
Project 1 involves 1,000 lead service line replacements as part of the Prioritization Program by qualified City of Milwaukee licensed and bonded contractors. The scope of work requires replacing lead service lines using trenchless methods such as pulling, hole hogging, boring, and directional drilling. Tasks include: full or partial replacement of water service lines from the municipal water main up to the interior water meter setting, updating non-compliant water meter settings, obtaining necessary permits, scheduling and conducting preconstruction surveys and installations with property owners, procuring and distributing water filter pitchers, traffic and erosion control, saw-cutting, excavation, installing new copper service lines, abandoning lead service lines, restoring electrical ground wires, backfilling, and restoring pavement, curb, gutter, and walk, as well as final site cleanup. Restoration requirements will be determined by MWW. All work must comply with the City of Milwaukee's regulations and specifications for water service line replacements. The contractor must begin construction on February 16, 2026, completing a minimum of five lead service line replacements per working day and not exceeding seven per working day without prior approval. All replacements must be substantially complete by November 13, 2026, and all work, including site restoration, by November 20, 2026. The contractor must ensure continuous work until completion and coordinate with property owners, establishing preconstruction meetings at least 24 hours in advance, providing multilingual communication, and completing each replacement within one working day per site. Permanent restoration must occur within five business days of substantial completion. There are requirements for labor, apprentice, and residency participation, including 40% of all hours worked by residents and 25% SBE participation. The contractor must meet apprentice utilization requirements, submit bid security equal to 10% of the base bid, comply with Davis-Bacon and Buy American provisions, and complete all required reporting and training as detailed by the City of Milwaukee.
Bid Results
Water / Sewer
$8,283,900.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2025
February 12, 2026
To be determined, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Nov 05 2025
Milwaukee, WI
Bid Date: Nov 18 2025
Milwaukee, WI
Bid Date: Nov 21 2025
Milwaukee, WI
Bid Date: Dec 04 2025
Milwaukee, WI
Bid Date: Nov 19 2025
Milwaukee, WI
Bid Date: Nov 14 2025
Milwaukee, WI
Bid Date: Nov 18 2025
Milwaukee, WI
Bid Date: Nov 25 2025
Milwaukee, WI
Bid Date: Nov 25 2025
Milwaukee, WI
Bid Date: Nov 17 2025
Milwaukee, WI
Bid Date: Dec 01 2025
Milwaukee, WI
Bid Date: Nov 12 2025
Milwaukee, WI
Bid Date: Dec 08 2025
Milwaukee, WI
Bid Date: Dec 06 2025
Milwaukee, WI
Bid Date: Nov 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.