Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

City of Milwaukee licensed and bonded contractors. Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods including, but not limited to, the following (Pulling, Hole Hogging, Boring, and Directional Drilling). All project locations are properties with lead service lines, as identified in the City of Milwaukee Prioritization Program. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. Work may include, but is not limited to, the procurement of all necessary permits, a site visit scheduled by the contractor to perform a preconstruction survey with the property owner and the City of Milwaukee prior to work beginning, scheduling the installation with the property owner, the procurement and distribution of water filter pitchers, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Temporary and permanent restoration requirements will be at the discretion of MWW. Project locations will be as shown on the project Site Maps and the contractor may be assigned replacement projects in one (or more) of the numbered work areas. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement - Prioritization Program. Time for Completion: Lead service line replacement construction shall begin on April 13, 2026. The contractor must complete a minimum of five (5) lead service line replacements each working day. The contractor may not perform more than seven (7) lead service line replacements in a working day without prior City approval. Substantial completion of all LSL replacements must be completed by November 13, 2026. All work, including site restoration, must be completed by November 20, 2026. Contractor may work standard hours as defined in the contract documents. Contractor may be charged inspection charges for exceeding standard working hours without prior City approval. Liquidated Damages, per diem: $1,000.00 The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's (OEI) website at online. If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. State of Wisconsin Disadvantaged Business Enterprise (DBE) Program contractors, including MBE's and WBE's, are encouraged to submit bid proposals. The apprenticeship requirements for this project are: one Construction Craft Laborer, one operating engineer, one plumber. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53215, and 53233. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid.

Bid Results

Water / Sewer

$6,193,545.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

18

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
424
Active Projects
255
Bidding Soon
2,071
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2025

April 13, 2026

Project location map

Multiple Locations, Milwaukee, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.