BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2025 at 7:00 PM

Updated November 13, 2025

Site work and paving for an industrial development in Batavia, Ohio. Completed plans call for site work for a one-story above grade industrial development.

The project requires the furnishing of all labor, equipment, and materials needed to construct Project No. 90420: South Afton Industrial Park, Phase 2, in accordance with the Ohio Department of Transportation Construction and Material Specifications (effective January 1, 2023 and its revisions and supplements), Standard Construction Drawings, Standard Bridge Drawings, Ohio Manual of Uniform Traffic Control, The State of Ohio Department of Transportation Bridge Design Manual, and other applicable standards in force on the date of letting and in accordance with the Project Specifications and Construction Plans on file in the office of the Clermont County Engineer. The project is located along Afton Drive, south of SR 32 and east of Half Acre Road, in Williamsburg Township. All bids must be submitted in a sealed envelope marked BID: PROJECT 90420, South Afton Industrial Park, Phase 2, and received in the office of the Clermont County Engineer, 2381 Clermont Center Drive, Batavia, Ohio 45103. Instructions to Bidders, Specifications, Bid Documents, and Plans detailing the terms and conditions of the proposed improvement may be obtained by interested Bidders from the Clermont County Engineer's Office at a non-refundable cost of twenty-five dollars each. Each bid must be accompanied by a bid guaranty in the form of either a bond for the full amount of the bid or a certified check, cashier's check, or irrevocable letter of credit in an amount equal to ten percent of the bid. The successful bidder will be required to file a performance bond in the full amount of the contract, or may submit a combined Bid Guaranty and Contract Bond, in accordance with the applicable sections of the Ohio Revised Code. Bid security in bond form must be issued by a Surety Company or Corporation licensed in Ohio. Letters of credit and bid bonds must have original signatures, and facsimile or electronic copies of bid security documents will be deemed non-responsive. Bidders must also comply with the prevailing wage rates on Public Improvements in Clermont County, Ohio, as determined by the Ohio Department of Industrial Relations.

Post-Bid

Industrial

$280,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
258
Active Projects
131
Bidding Soon
2,126
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

December 8, 2025

Project location map

2381 Clermont Center Drive Batavia Ohio 45103, Batavia, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.