BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 30, 2025 at 8:00 PM

Updated December 2, 2025

Site work and paving for a road / highway in Waco, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Description Resurfacing and new paving of multiple roads in note 3 in some of the road information sheets, it says temporary striping/temporary tape. Do not bid striping at all, just temporary tape only Please contact Terry Edwards at (770) 646-3278 with any questions. Haralson County is accepting proposals for resurfacing 1.52 miles of Beech Creek from Hwy. 120 to pavement dead end. The road is to be patched with 4" milling & 4" binder (19MM) & (1,308 tons), resurfaced with Recycled Leveling including Bitum Tackcoat & H Lime (85#/SY) & Recycled 9.5MM Type I including Bitum & H Lime (135#/SY), totaling 220#/SY. No resurfacing shall be done unless the temperature is at least 45 degrees & rising; and all work is to be done to DOT specifications. Below is an overview of the roadwork in question: Road Name: Beech Creek Segment: Hwy. 120 to pavement dead end Width: 20ft. Length in Miles: 1.52

Post-Bid

Roads / Highways

$300,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
264
Active Projects
173
Bidding Soon
2,000
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2025

December 31, 2025

Project location map

Beech Creek, Waco, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.