Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 24, 2025 at 8:00 PM
Updated October 25, 2025
Renovation of an educational facility in Emporia, Kansas. Conceptual plans call for the renovation of a educational facility.
Stormont Maintenance Facility currently houses the operations of the University Facilities Department (Physical Plant Shops, Building Maintenance, etc.). Initially the plan was to build a new Facilities building and move an academic program into the current space. With the space utilization study, facilities' condition report and fiscal realities, ESU has determined a more viable solution is to upgrade the existing Stormont Maintenance Center. Stormont Maintenance Center is a 29,922 GSF facility and is centrally located on campus. Remodeling the existing structure will create a safer campus environment for facility employees and campus pedestrians. This project would also consolidate three existing 56-year old storage buildings with one larger storage facility for materials and equipment. This project will address $2.5 million in deferred maintenance. A Project Program document will be developed based on the Campus Master Plan and will be presented for review and approval. The FY2026 component of this project would provide preliminary and final planning for the project. The project is included in the state's 2027 - 2031 Capital Improvement Program (CIP). As of October 24, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Educational
$3,813,000.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
1 Kellogg Cir, Emporia, KS
Related To This Project
Emporia, KS
--
Emporia, KS
Bid Date: Nov 25 2025
Emporia, KS
Bid Date: Nov 25 2025
Emporia, KS
Bid Date: Nov 21 2025
Emporia, KS
Bid Date: Dec 17 2025
Emporia, KS
Bid Date: Dec 09 2025
Emporia, KS
--
Emporia, KS
Bid Date: Nov 18 2025
Emporia, KS
Bid Date: Oct 15 2025
Emporia, KS
Bid Date: Oct 22 2025
Emporia, KS
Bid Date: Oct 22 2025
Emporia, KS
--
Emporia, KS
Bid Date: Sep 18 2025
Emporia, KS
Bid Date: Sep 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
