BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 11, 2025 at 7:00 PM

Updated November 14, 2025

Site work and outdoor lighting for a playground / park / athletic field in Princeton, Texas. Completed plans call for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

Exterior specialty lighting & electrical services J.M. Caldwell park phase 2 : exterior sports field lighting new soccer / new multi-sport fields only. Question Deadline 11/05/2025 at 4:00 PM CT. This project does not have HUB / SBE, WBE requirements The City of Princeton is eastern emerging edge of expansive growth in North Texas. The city desires to complete the exterior specialty sports field lighting as part of the second phase of J.M. Caldwell Park to meet the growing demands of the city where the population is growing at nearly 10% per year or more in terms of residents and rooftops and to increase overall access to sports fields within the city. This project is part of the Parks and Recreation bond and fully endorsed to move forward with the outlined municipal bond funding sources. The desire is to onboard company based on best value and immediately move into contract award and construction start assuming project is withing budget. If project exceeds the desired projected cost range some project considerations may be adjusted, but the project will move forward.Description of Project: In the simplest of terms this project consists of providing [furnish & install] all electrical systems needed for the lighting systems indicated in the construction documents. This will include all underground and above ground infrastructure and necessary systems and indicated to provide as a turnkey solution, including but not limited to light poles and pole bases to ensure a complete and function system. This project is intended to be limited to the new qty. (3) fields being constructed and does not include any electrical lighting work or rework to existing field lighting currently in place for the other fields such as baseball to enhance, modify or upgrade unless required to ensure all light poles are on the same operating system and to ensure fully integrated functionality with the existing lights and lighting systems / controllers. It is not intended for these to be freestanding or standalone from the existing system as it relates to functionality and intended to be seamless and fully integrated with the existing programs, control systems, scheduling software and user interfaces. The systems are to be fully integrated with the existing systems but it is not intended to replace existing poles, existing bases or existing electrical systems as these are within service lift and fully functional at this time. Items noted as alternates are to be indicated as separate figures.

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - City

Outdoor Lighting, Site Work

35

5

9

7

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 13, 2025

January 12, 2026

Project location map

500 W College Ave, Princeton, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.