Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 21, 2025 at 7:00 PM
Updated November 22, 2025
Renovation of a municipal facility in Houston, Texas. Working plans call for the renovation of a municipal facility.
Harris County Department of Education (HCDE) is seeking Proposals for Construction Manager-at-Risk (CMAR) from qualified proposers to provide consultation during and after the design of the project and serve as the general contractor for the existing HVAC and Partial Roof Recover Project at Harris County Department of Education's North Post Oak facility located at 6005 Westview Drive, Houston, TX 77055. Question Deadline 11/13/2025 at 5:00 PM CT Proposals shall be submitted electronically The Project consists of two distinct scopes: Scope A: HVAC & Miscellaneous Modifications and Scope B: Partial Roof Recover, which include, but are not necessarily limited to: SCOPE A - HVAC & Miscellaneous Modifications - Replacement of Four (4) Dock Levelers at Warehouse Areas - Modification of Warehouse Area Work Area Walls to provide separation from adjacent Warehouse Areas. - Modification of existing fire sprinkler system, where required by wall and/or ceiling modifications. - Construction of interior partition at Level 02 to define area for future build-out of office and support areas. - Maintenance/End of Life Systems Replacement to include: Replacement of approximately 400-ton existing Roof Top HVAC Units as required; note that the intent is to change form RTUs to VRF system on designated portions of the building and as such, the actual number of units is not known at this time. Replacement of interior HVAC ductwork as required. Installation of Variable Refrigerant Flow (VRF) System at Office and Support Areas. Replacement of Building Automation System (BAS) Controls. Fire Alarm System Update. - Site Development: TAS Required site accessibility modifications. Development of a phasing/occupancy plan for the move-out. SCOPE B - Partial Roof Recover - Partial Roof Recover Eastern Portion of Roof (approximately 100,000 square feet); the entire roof system is not being replaced but instead, the roof membrane only.
Final Planning
Municipal
$5,698,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 18, 2025
March 2, 2026
6005 Westview Dr, Houston, TX
Related To This Project
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Nov 04 2025
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Nov 11 2025
Houston, TX
Bid Date: Dec 04 2025
Houston, TX
--
Houston, TX
--
Houston, TX
Bid Date: Nov 04 2025
Houston, TX
Bid Date: Nov 25 2025
Houston, TX
Bid Date: Nov 18 2025
Houston, TX
Bid Date: Nov 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
